Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Saco de Nova Olinda | Brazil | SRH (Secretaria de RecursosHidricos) | F I W | Gravata | 97 | 07/85 | 07/86 | 10/86 | 06/87 | 56 | 230 | 132 | 143 | V | (1) | 0.80 | (3)* | separate | 400 | 400 | 55 | 15 | (N) | |
Caraibas - CEMIG | Brazil | CEMIG (Companhia Energetica de Minas Gerais) | F I | Caraibas | 10 | 04/90 | 07/90 | 09/90 | 02/91 | 26 | 160 | 18 | 22 | 0.10 | (1) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 70 | 20 | (N) |
Gameleira | Brazil | CODEVASF | F I R W | Gameleira | 145 | 07/90 | 12/90 | 04/91 | 05/91 | 29 | 150 | 27 | 29 | V | (1) | (1)* | 400 | 400 | 52 | 13 | (-) - | |||
Pelo Sinal | Brazil | SUPLAN/RN | W | Taperobá | 76 | 12/91 | - /92 | - /93 | - /94 | 34 | 296 | 69 | 89 | (1) | 300 | 300 | 64 | 16 | (-) - | |||||
Várzea Grande | Brazil | SUPLAN/PB | W | Picuí | 21 | 10/93 | 10/94 | 10/94 | - /95 | 31 | 135 | 27 | 28 | (1) | (3)* | 300 | 300 | 56 | 14 | (N) | ||||
Cova da Mandioca | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba | I | Cova da Mandioca | 126 | 01/93 | 09/93 | 12/94 | 12/94 | 32 | 360 | 75 | 79 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 400 | 400 | 64 | 16 | (-) - |
Do Prata | Brazil | Companhia Pernambucana de Saceamento | W | Do Prata | 42 | - /92 | 09/93 | 12/94 | - /95 | 26 | 405 | 61 | 75 | 300 | 300 | 80 | 0 | (-) - | ||||||
Canoas | Brazil | SRH/CE (Secretaria de Rewrsos Hidricos-CE) | W | Saõ Gonçalo | 69 | 07/93 | 08/94 | 05/95 | - /96 | 51 | 116 | 87 | 93 | 0.10 | (1) | 0.80 | (10)* | 0.80 | (1)* | 300 | 300 | 64 | 16 | (N) |
Acauã | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Paraíba | 247 | - /93 | - /93 | - /95 | - /95 | 79 | 674 | 674 | 734 | (1) | (3)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
Juba I | Brazil | Brennand Energia | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 238 | 96 | 113 | 60 | 15 | (N) | |||||||||
Juba II | Brazil | Brennand Energia | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 250 | 105 | 114 | 60 | 15 | (N) | |||||||||
Passagem de Trairas | Brazil | Secretaria Estadual do Meio Ambiente e Recursos Hídricos do RN | R W | Seridó | 50 | - /93 | - /94 | - /95 | - /96 | 26 | 458 | 27 | 28 | 64 | 16 | (N) | ||||||||
Jordão | Brazil | COPEL (Companhia Paranense de Energia) | H | Jordão | 110 | 05/94 | 01/95 | 02/96 | 09/96 | 95 | 550 | 570 | 647 | V | (1) | 0.74 | (3)* | 0.74 | (12) | 400 | 400 | 60 | 15 | (N) |
Derivação do Rio Jordão | Brazil | Copel Geração e Transmissão S.A. | H | Jordão | 110 | 05/94 | - /95 | - /96 | 12/97 | 66 | ||||||||||||||
Rio do Peixe | Brazil | CPEE (Companhia Paulista de Energia Elétrica) | H | Do Peixe | 2 | 02/96 | 12/96 | 12/97 | - /98 | 32 | 300 | 20 | 34 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 120 90 | 0 0 | (-) - |
Saneago Goiânia | Brazil | Saneamento de Goiás S/A | W | - /86 | - /95 | - /97 | - /97 | 47 | 129 | |||||||||||||||
Pedro Moura Junior - formerly Belo Jardim | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | W | Ipojuca | 37 | 05/95 | 09/96 | - /97 | - /98 | 56 | 420 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
Gov. José Richa - formerly Salto Caxias | Brazil | COPEL (Companhia Paranense de Energia) | H | Iguaçu | 3573 | 02/95 | 01/96 | 07/98 | 12/98 | 67 | 1083 | 912 | 1438 | V | (13) | 0.75 | (1)* | 0.75 | (12) | 300 | 300 | 80 | 20 | (F) |
Val de Serra | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Ibicui-Mirim | 24 | 07/97 | 11/97 | 07/98 | 11/98 | 37 | 675 | 69 | 95 | V | (13) | (12)* | (12)* | 300 | 300 | 90 | 30 | (F) | ||
Jucazinho | Brazil | DNOCS (Departamento Nacional de Obras Contra a Secas) | F I R W | Capiibaribe | 286 | 07/96 | 11/96 | 10/98 | - /99 | 63 | 442 | 472 | 500 | V | (12) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 64 | 16 | (N) |
Bertarello | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Arroio Burati | 6 | - /98 | 08/98 | 07/99 | - /00 | 29 | 219 | 80 | 115 | V | (13) | (12)* | (12)* | 300 | 300 | 72 | 18 | (N) | ||
Rosal | Brazil | Empresas de Electricidade Vale Paranapanema | H | Itabapoana | 17 | 04/98 | - /98 | 09/99 | - /00 | 37 | 212 | 45 | 75 | (1) | (3)* | (1)* | 300 | 300 | 45 | 55 | (S) | |||
Ponto Novo | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | W | Itapicuru-açu | 39 | 05/98 | 07/98 | 12/99 | 02/00 | 32 | 266 | 90 | 105 | (1) | (3)* | (1) | 300 | 300 | 72 | 18 | (N) | |||
Guilman-Amorin | Brazil | Belgo Mineira-Samarco | H | Piracicaba | 12 | - /97 | - /98 | - /99 | - /00 | 41 | 499 | 85 | 102 | 300 | 300 | 80 | 20 | (N) | ||||||
Tucuruí - 2nd Phase | Brazil | Eletronorte SA | H | Tocantins | 06/98 | 06/99 | 09/00 | 10/05 | 78 | 1541 | 88 | 8800 | (3) | (3)* | separate | 300 | 300 | 70 | 30 | (N) | ||||
Dona Francisca | Brazil | Dona Francisca Energértica SA | H | Jacuí | 335 | 08/98 | 06/99 | 10/00 | 12/00 | 63 | 670 | 485 | 665 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 300 | 300 | 72 | 18 | (N) |
Santa Cruz do Apodi | Brazil | Secretaria Estadual do Meio Ambiente e Recursos Hídricos do RN | F I R W | Apodi | 600 | - /98 | - /99 | - /00 | - /01 | 58 | 1660 | 1023 | 1120 | 300 | 300 | 80 | 0 | (-) - | ||||||
Tiúma | Brazil | Companhia Pernambucana de Saneamento | W | Tiúma | 6 | - /99 | - /00 | 01/01 | 05/01 | 16 | 290 | |||||||||||||
Cana Brava | Brazil | Companhia Energética Mercosul (of the Tractebel Group) | H | Tocantins | 2300 | 03/99 | 02/00 | 10/01 | 10/02 | 71 | 510 | 527 | 833 | (1) | (3)* | ogee | (1) | 300 | 300 | 40 | 50 | (S) | ||
Castanhão | Brazil | DNOCS/Minas Gerais | F I R W | Congonhas | 800 | 10/99 | - /00 | 12/01 | - /02 | 85 | 668 | 890 | 1030 | 300 | 300 | 85 | 0 | (-) - | ||||||
Lajeado (Luis Eduardo Magalhães) | Brazil | Investco (Tractebel) | H | Tocantins | 4982 | 07/98 | 06/01 | 12/01 | 12/02 | 43 | 2100 | 188 | 210 | 300 | 300 | 30 | 40 | (S) | ||||||
Umari | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I R W | do Carmo | 293 | - /98 | - /99 | - /01 | - /01 | 42 | 2308 | 644 | 658 | (12) | 300 | 300 | 70 | 0 | (-) - | |||||
Funil | Brazil | Aliança Geração de Energia SA | H | Rio Grande | 285 | - /97 | - /99 | - /01 | 12/02 | 50 | ||||||||||||||
Pedras Altas | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | F I R W | Itapicuru | - /00 | - /00 | - /01 | - /01 | 24 | 220 | 42 | 60 | 300 | 300 | 34 | 41 | (-) - | |||||||
Pirapama | Brazil | CAGEPE (Companhia Pernambucana de Saneamento) | W | Pirapama | 61 | - /00 | - /00 | - /01 | - /01 | 25 | 300 | 87 | 137 | (1) | 300 | 300 | 72 | 18 | (-) - | |||||
Estreito | Brazil | Ceste | F I R W | Curimatá | 24 | - /97 | - /00 | - /01 | 11/02 | 26 | 300 | 300 | 300 | 64 | 16 | (N) | ||||||||
Camará | Brazil | Estado da Paraiba (Companhia de Aguas e Esgotus) | W | Riachäo | 27 | 05/00 | 09/01 | 06/02 | - /02 | 50 | 465 | V | (1) | 0.80 | (1) | 300 | 300 | 80 | 0 | (-) - | ||||
Carnaúba | Brazil | Secretaria Recursos Hídricos | I W | Quixeré | 26 | - /01 | 02/02 | 11/02 | - /03 | 19 | 200 | 300 | 300 | 100 | 0 | (-) - | ||||||||
Itiquira | Brazil | H | - /00 | - /00 | - /02 | - /02 | 15 | 22 | ||||||||||||||||
Rio São Bento | Brazil | CASAN (Companhia Catarinense de Águas e Saneamento) | H | Rio São Bento | 58 | - /99 | - /00 | - /02 | - /03 | 41 | 240 | V | 0.80 | 0.80 | ||||||||||
Furquim [H-F] | Brazil | H | - /00 | - /01 | - /02 | - /03 | 18 | |||||||||||||||||
Guaporé | Brazil | Tangará Energia S/A | H | Guaporé | 18 | - /00 | - /01 | - /02 | - /03 | 32 | 152 | 43 | ||||||||||||
Jauru | Brazil | Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%) | H | Jauru | 20 | - /00 | - /01 | - /02 | - /03 | 51 | ||||||||||||||
Serra do Facão | Brazil | GEFAC | H | Sao Marcos | - /01 | 09/02 | - /03 | - /05 | 80 | 326 | 610 | 742 | 300 | 300 | 72 | 18 | (N) | |||||||
Monte Claro | Brazil | CERAN (Companhia Energética Rio das Antas) | H | Das Antas | 11 | 04/02 | - /03 | - /04 | 12/04 | 33 | 232 | 35 | 66 | 75 | ||||||||||
João Leite | Brazil | SANEAGO-Saneamento de Goiás S.A. | W | João Leite | 129 | 03/01 | 01/03 | - /04 | - /04 | 55 | 380 | 270 | 290 | 300 | 300 | 80 | 20 | (N) | ||||||
Risoleta Neves - formerly Candonga | Brazil | Novelis do Brasil Ltda | H | Doce | 54 | 05/01 | - /03 | - /04 | 05/05 | 53 | 311 | 236 | 356 | 300 | 300 | 40 | 50 | (S) | ||||||
Pindobaçu | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Itapicuru-aço | 17 | - /01 | - /03 | - /04 | - /05 | 46 | 209 | 75 | 91 | 300 | 300 | 56 | 14 | (N) | ||||||
Bandeira de Melo | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Paraguaçu | 122 | - /01 | 09/03 | - /04 | - /05 | 20 | 320 | 75 | 87 | (1) | (1)* | (1)* | 300 | 300 | 56 | 14 | (N) | |||
Santa Clara - Jordão | Brazil | Elejor Centrais Elétricas do Rio Jordåo | H | Jordåo | 431 | 11/02 | 12/03 | - /04 | 01/05 | 67 | 588 | 438 | 504 | (1) | (1) | (1)* | 300 | 300 | 40 | 50 | (S) | |||
Barra Grande | Brazil | BAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética) | H | Pelotas | 50000 | - /01 | - /02 | - /05 | - /06 | 85 | 665 | 100 | ||||||||||||
Picada | Brazil | Votorantim S.A. | H | 7 | - /02 | - /03 | - /05 | - /06 | 32 | |||||||||||||||
Cachoeira Grande | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | H | Chopin | - /04 | - /04 | - /05 | - /05 | 16 | 225 | 15 | |||||||||||||
Peixe Angical | Brazil | Enerpeixa S/A | H | Tocantins | 2741 | 04/02 | - /04 | - /05 | 09/06 | 39 | 400 | 500 | 582 | 300 | 300 | 70 | 0 | (-) - | ||||||
Säo Bernardo | Brazil | CJ Energética S/A | H | 2 | - /03 | - /04 | - /05 | - /06 | 20 | 120 | ||||||||||||||
Artur Tavares de Melo | Brazil | Usina Olho de’Água | I | Itambé | 20 | - /03 | - /04 | - /05 | - /06 | 27 | 306 | 50 | 300 | 300 | 80 | 0 | (-) - | |||||||
Poço do Magro | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba) | 37 | - /03 | - /04 | - /05 | - /06 | 29 | 540 | 58 | 68 | 64 | 16 | (N) | ||||||||||
Flor do Sertão | Brazil | Maue Geradora | W | 05/05 | - /05 | - /06 | 10/06 | 19 | 245 | |||||||||||||||
Esmeralda | Brazil | H | 1 | - /05 | - /05 | - /06 | - /06 | 19 | 15 | 27 | 64 | 16 | (N) | |||||||||||
Mosquitão | Brazil | Concessionária Mosquitão S/A | H | 19 | - /04 | - /05 | - /06 | - /07 | 32 | 236 | 57 | 76 | ||||||||||||
Fundão | Brazil | ELEJOR - Centrais Elétricas do Rio Jordão | H | Jordao | 34 | - /04 | - /05 | - /06 | - /07 | 43 | 445 | 200 | 220 | 300 | 300 | 64 | 16 | (N) | ||||||
Serra Preta | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | W | 4 | - /05 | - /05 | - /07 | - /08 | 34 | 172 | 44 | 51 | V | 0.80 | 0.80 | 80 | 20 | (N) | ||||||
Ludesa [H-F] | Brazil | CPFL Renovaveis | H | Chapecó | 142 | - /06 | - /06 | - /07 | 04/07 | 29 | 300 | 1.50 | 1.50 | 0.75 | ||||||||||
Castro Alves | Brazil | CERAN (Companhia Energética Rio das Antas) | H | Das Antas | 92 | - /05 | - /06 | - /07 | 02/08 | 45 | 350 | 240 | 322 | V | 1.30 | 1.30 | 60 | 15 | (N) | |||||
Quatorze (14) de Julho | Brazil | CERAN (Companhia Energética Rio das Antas) | H | Das Antas | 55 | - /05 | - /06 | - /07 | 10/08 | 37 | 281 | 75 | 212 | V | 1.30 | 1.30 | 75 | 15 | (N) | |||||
Duas Serras | Brazil | Companhia Pernambucana de Saneamento | F | Duas Serras | 2 | - /05 | - /06 | - /07 | - /08 | 19 | 113 | 6 | 300 | 300 | ||||||||||
Cotiporã | Brazil | H | - /07 | - /07 | - /07 | - /07 | 16 | 196 | 21 | 41 | ||||||||||||||
Plano Alto | Brazil | CPFL Renovaveis | H | 2 | - /06 | - /07 | - /07 | 02/08 | 38 | 173 | 42 | 78 | V | 0.75 | 0.75 | 72 | 19 | (N) | ||||||
Jararaca | Brazil | Veneto Energética S/A | H | das Antas | 8 | - /06 | - /07 | - /07 | 04/08 | 25 | 220 | 31 | 61 | 72 | 18 | (N) | ||||||||
Linha Emilia | Brazil | Linha Emília Energética S/A | H | Carreiro | 12 | - /06 | - /07 | - /07 | - /08 | 30 | 205 | 35 | 54 | |||||||||||
Santa Laura | Brazil | Santa Laura S/A | H | Chapecozinho | 19 | - /06 | - /06 | - /08 | - /08 | 27 | 24 | 42 | ||||||||||||
Santa Rosa II | Brazil | Santa Rosa S/A | H | Grande | 7 | - /06 | - /06 | - /08 | - /08 | 31 | ||||||||||||||
Cachoeirão | Brazil | Hidrelétrica Cachoeirão SA | H | Manhuaçu | - /07 | - /07 | - /08 | - /08 | 23 | 90 | ||||||||||||||
Alto Irani [H-F] | Brazil | CPFL Renovaveis | H | Irani | 2 | - /07 | - /07 | - /08 | - /08 | 44 | 270 | 14 | 20 | 2.50 | 2 | 2 | ||||||||
São Simão | Brazil | São Simão Energia S/A | H | Itapemirim | 11 | - /06 | - /07 | - /08 | 02/09 | 56 | 187 | 92 | 115 | |||||||||||
Angelina (formerly Portobello - Corredeira do Encano) | Brazil | Lumbrás Energética S.A. | H | Garcia | - /07 | - /07 | - /08 | 03/09 | 45 | 178 | ||||||||||||||
Engenheiro Henrique Kotzian | Brazil | BME Energia SA | H | Ivaí | 9 | - /06 | - /07 | - /08 | 04/09 | 40 | 227 | 58 | 76 | |||||||||||
Pedra do Garrafão | Brazil | H | Itabapoana | - /07 | - /07 | - /08 | 05/09 | 15 | 110 | |||||||||||||||
Goiandira | Brazil | Goiás Sul Geração de Energia S.A. | H | Verissimo | 76 | 08/07 | - /07 | - /08 | 05/09 | 44 | 341 | V | 0.75 | 0.75 | ||||||||||
Rodeio Bonito | Brazil | Velcan Energy Development Ltda. | H | Irani | 9 | - /06 | - /07 | - /08 | 01/10 | 32 | 223 | 59 | V | 0.85 | 0.85 | |||||||||
Ernesto Jorge Dreher | Brazil | BME Energia | H | Ivaí | 4 | - /07 | - /08 | - /08 | 04/09 | 23 | 220 | 29 | 35 | 68 | 17 | (N) | ||||||||
Salto | Brazil | H | - /07 | - /07 | - /09 | - /09 | 42 | |||||||||||||||||
Cristalandia | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | I W | de Contas | 17 | - /05 | - /07 | - /09 | - /10 | 18 | 337 | |||||||||||||
São Pedro | Brazil | Säo Pedro Energia S/A | H | Jacu Braço Norte | 2 | - /06 | - /07 | - /09 | - /10 | 30 | 140 | 22 | 35 | |||||||||||
Criúva | Brazil | Criúva Energética S/A | H | Lajeado Grange | 7 | - /08 | - /08 | - /09 | 12/09 | 23 | 246 | 80 | 95 | 72 | 18 | (N) | ||||||||
Areia Branca | Brazil | Hidrelétrica Areia Branca S.A. (Tractebel Energia) | H | Manhuaçu | - /08 | - /08 | - /09 | - /09 | 28 | 257 | ||||||||||||||
Palanquinho | Brazil | Serrana Energética S/A | H | Lajeado Grande | 6 | - /07 | - /08 | - /09 | 01/10 | 32 | 137 | 89 | 103 | 72 | 18 | (N) | ||||||||
Mulungu do Morro | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | I W | Tijuco | 2 | - /07 | - /08 | - /09 | 03/10 | 23 | 156 | |||||||||||||
Poço do Marrua | Brazil | COMDEP | I W | Parnaiba | 293 | - /07 | - /08 | - /09 | - /10 | 48 | 806 | 506 | 630 | |||||||||||
Barra dos Coqueiros | Brazil | Gerdau SA | H W | Claro | 08/07 | - /08 | - /09 | 07/10 | 15 | |||||||||||||||
São José | Brazil | Companhia Energetica de Sao Paulo | H | Carreiro | - /07 | - /08 | - /09 | - /10 | 30 | |||||||||||||||
Passo de Meio | Brazil | Energética Campos de Cima da Serra Ltda | H | das Antas | 27 | - /07 | - /08 | - /09 | - /10 | 31 | 110 | |||||||||||||
Caçu | Brazil | Gerdau SA | H | Claro | - /07 | - /08 | - /09 | - /10 | 40 | |||||||||||||||
Santa Clara | Brazil | Centrais Elétricas do Rio Jordão S/A | H | Mucuri | 151 | - /07 | - /08 | - /09 | - /10 | 72 | 242 | 520 | 600 | 300 | 300 | 0 | ||||||||
Arvoredo | Brazil | CPFL Renovaveis | H | Irani | 2 | - /08 | - /09 | - /09 | 04/10 | 39 | 250 | 53 | 81 | V | 0.75 | 0.75 | 80 | 20 | (N) | |||||
Gasparino | Brazil | Andrade Galvão Engenharia Ltda. | W | - /07 | - /08 | - /10 | 10/10 | 28 | 1000 | 130 | ||||||||||||||
Rondon II | Brazil | Eletrogoes S/A. | H | 478 | - /07 | - /08 | - /10 | - /11 | 19 | |||||||||||||||
Figueirópolis | Brazil | CPFL Renovabeis | H | Jauru | 34 | - /08 | - /09 | - /10 | 12/10 | 28 | 170 | V | 0.43 | 0.75 | ||||||||||
Pipoca | Brazil | Hidrolétrica Pipoca S/A | H | Santo Antonio | 8 | - /08 | - /09 | - /10 | - /11 | 26 | ||||||||||||||
Ibirama | Brazil | Ibirama Energética SA | H | - /09 | - /09 | - /10 | - /10 | 15 | ||||||||||||||||
Ninho da Águia | Brazil | CPFL Renovaveis | H | Santo Antônio | 1 | - /09 | - /09 | - /10 | - /10 | 15 | 94 | 14 | V | 0.75 | 0.75 | |||||||||
Caju | Brazil | Energisa Geracao Rio Grande S/A | H | Rio Grande | 10 | - /09 | - /09 | - /10 | 03/11 | 38 | 220 | 66 | 82 | |||||||||||
Lavrinha | Brazil | BME | H | Paraiba do Sul | 12/07 | - /09 | - /10 | - /11 | 28 | 85 | ||||||||||||||
Ingazeira - formerly San Antonio | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | W | Pajeú | 49 | - /08 | - /09 | - /10 | - /11 | 26 | 566 | 64 | 92 | |||||||||||
São Gonçalo - formerly Santa Bárbara | Brazil | SPE São Gonçalo Energia S.A. | H | Santa Bárbara | 6 | - /08 | - /09 | - /10 | - /11 | 28 | 154 | 14 | 26 | V | 0.75 | 0.75 | 68 | 17 | (N) | |||||
Simplicio | Brazil | Furnas Centrais Elétricas S/A. | H | - /08 | - /09 | - /10 | - /11 | 30 | 260 | 94 | ||||||||||||||
Corrente Grande | Brazil | CPFL Renovaveis | H | Corrente Grande | 12 | - /10 | - /10 | - /10 | - /10 | 30 | 115 | V | 0.75 | 0.75 | ||||||||||
Marco Balbo | Brazil | H | - /10 | - /10 | - /10 | - /10 | 30 | 42 | 73 | |||||||||||||||
Mauá | Brazil | Consorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA) | H | Tibagi | 84 | - /09 | 01/10 | 05/11 | - /12 | 85 | 745 | 633 | 753 | V | (2) | 0.80 | (10) | 300 | 2400 | 60 | 15 | (N) | ||
Anta | Brazil | Furnas | H | Paraiba do Sul | 114 | - /09 | - /10 | - /11 | 12/11 | 30 | 270 | 44 | 55 | |||||||||||
Moínho | Brazil | Statkraft | H | Bernado Jose | 1 | - /09 | - /10 | - /11 | - /11 | 22 | 9 | 25 | 68 | 17 | (N) | |||||||||
Autódromo | Brazil | Autódromo Energética S/A | Carreiro | 4 | - /10 | - /10 | - /11 | - /11 | 23 | 200 | 21 | 47 | 67 | 17 | (N) | |||||||||
Boa Fé | Brazil | Boa Fé Energética | H | Carrero | - /10 | - /10 | - /11 | - /11 | 26 | 198 | 32 | 58 | ||||||||||||
Santo Antonio | Brazil | Energisa Geracao Rio Grande S/A | H | Rio Grande | 17 | - /09 | - /10 | - /11 | 02/12 | 44 | 285 | 81 | 105 | |||||||||||
São Sebastião do Alto | Brazil | Energisa Geracao Rio Grande S/A | H | Rio Grande | 44 | - /09 | - /10 | - /11 | - /12 | 40 | 200 | 51 | 75 | |||||||||||
Boa Sorte | Brazil | Boa Sorte Energética S/A | H | Tijucas | 18 | - /07 | - /07 | - /12 | - /12 | 26 | ||||||||||||||
Ouro | Brazil | H | - /10 | - /10 | - /12 | - /12 | 16 | |||||||||||||||||
Victor Baptista Adami (formerly Passos Maia) | Brazil | Passo Maia Energética S.A. (Adami, Desenvix, Statkraft) | H | Chapecó | 14 | - /10 | - /11 | - /12 | 09/12 | 34 | 66 | 72 | 18 | (N) | ||||||||||
Marrecas | Brazil | SAMAE | W | Marrecas | 33 | 03/10 | - /11 | - /12 | 12/12 | 35 | 430 | |||||||||||||
Água Limpa | Brazil | Água Limpa Energia S/A | H | Palmeiras | 10 | - /11 | - /11 | - /12 | - /12 | 79 | 674 | 42 | ||||||||||||
Retiro | Brazil | CTG Brasil | Sapucai | 18 | - /10 | - /11 | - /12 | 07/13 | 15 | 482 | ||||||||||||||
Garibaldi | Brazil | CTG Brasil (previously Triunfo Engergia) | H | Canoas | - /10 | - /11 | - /12 | 09/13 | 40 | 490 | 264 | 382 | ||||||||||||
Mamoeiro | Brazil | Estado do Ceará | W | 21 | - /10 | - /11 | - /12 | - /13 | 15 | |||||||||||||||
Ivan Botelho I (Ponte) | Brazil | Centrais Hidrelétricas Grapon S/A | H | Pomba | 17 | - /10 | - /11 | - /12 | - /13 | 32 | ||||||||||||||
Pezzi | Brazil | Pezzi Energética S.A. | H | das Antas | 24 | - /11 | - /12 | - /12 | - /13 | 42 | 44 | 80 | 76 | 19 | (N) | |||||||||
Serra dos Cavalinhos II | Brazil | Serra dos Cavalinhos II Energética S.A. | H | das Antas | 24 | - /11 | - /12 | - /12 | - /13 | 42 | 33 | 80 | 72 | 18 | (N) | |||||||||
Rastro de Auto | Brazil | H | - /11 | - /11 | - /13 | - /13 | 23 | |||||||||||||||||
João Borges | Brazil | Eletrosul Centrais Elétricas SA | H | Caneiras | - /12 | - /12 | - /13 | 11/13 | 24 | 273 | ||||||||||||||
Barra de Rio Chapéu | Brazil | Eletrosul Centrais Elétricas S/A | H W | Braço do Norte | 21 | - /12 | - /12 | - /13 | - /13 | 21 | ||||||||||||||
Serro Azul | Brazil | W | 303 | - /12 | - /13 | - /14 | - /15 | 66 | 1015 | |||||||||||||||
Teles Pires | Brazil | ANEEL (Agência Nacional de Energia Elétrica) | H | Teles Pires | 1 | 07/11 | - /13 | - /15 | 09/16 | 80 | 360 | 500 | 1020 | |||||||||||
Igarapeba | Brazil | Secretária de Desenvolvimento Econômico | W | Una | 69 | - /13 | - /14 | - /15 | - /16 | 61 | ||||||||||||||
Mata Velha [H-F] | Brazil | CPFL Renovaveis | H | Preto | 38 | - /14 | - /14 | - /15 | 04/16 | 44 | 272 | 45 | 65 | 1.25 | 1.25 | 1.25 | ||||||||
Jubinha I | Brazil | Itamarati Norte S.A. | H | Jubinha | 480 | - /15 | - /15 | - /15 | - /15 | 21 | 1540 | |||||||||||||
Juba IV | Brazil | Itamarati Norte S.A. | H | Juba | 7 | - /15 | - /15 | - /15 | - /15 | 26 | 570 | |||||||||||||
Cacimba Nova | Brazil | Projeto Transposição das Águas do Rio São Francisco | I W | 3 | - /13 | - /14 | - /16 | - /16 | 18 | 196 | 52 | |||||||||||||
Belo Monte | Brazil | Norte Energia S.A. | H | Xingu | 5 | - /11 | - /14 | - /16 | - /20 | 74 | 680 | 63 | 2208 | V | 1.20 | separate | ||||||||
São Roque | Brazil | São Roque Energética S.A. | H | Canoas | - /12 | - /17 | - /18 | - /19 | 68 | 151 | 100 | 583 | V | 0.75 | 0.75 | |||||||||
Itaocara | Brazil | Cemig Geração e Transmissão SA and Itaocara Energia Ltda | H | Paraiba do Sul | 1700 | 01/16 | - /17 | - /18 | - /19 | 50 | ||||||||||||||
Panelas II | Brazil | Secretária de Desenvolvimento Econômico | W | 23 | - /16 | - /17 | 06/19 | - /20 | 55 | |||||||||||||||
Taquarembó | Brazil | W | 05/08 | - /10 | - /19 | - /20 | 33 | 330 | ||||||||||||||||
Negreiros | Brazil | FUNCATE-Fundação de Ciência,Aplicações e Tecnologia Espaciais | W | 495 | - /17 | - /18 | - /19 | - /20 | 35 | 249 | 56 | |||||||||||||
Miguillas | Brazil | - /17 | - /19 | - /20 | - /21 | 35 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: SRH (Secretaria de RecursosHidricos)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gravata
Reservoir capacity: 97 m3x106
Construction Dates
Start of Project: 07/85
Start of RCC: 07/85
End of RCC: 10/86
End of Project: 06/87
Specifications
Height: 56 metres
Length: 230 metres
Volume of RCC: 132 m3x103
Total volume: 143 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CEMIG (Companhia Energetica de Minas Gerais)
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Caraibas
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/90
Start of RCC: 04/90
End of RCC: 09/90
End of Project: 02/91
Specifications
Height: 26 metres
Length: 160 metres
Volume of RCC: 18 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CODEVASF
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Gameleira
Reservoir capacity: 145 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 04/91
End of Project: 05/91
Specifications
Height: 29 metres
Length: 150 metres
Volume of RCC: 27 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
52 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
13 | No pozzolan used - |

Details
Country: Brazil
Owner: SUPLAN/RN
Type: Gravity
Purpose(s): Water Supply
River: Taperobá
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 12/91
Start of RCC: 12/91
End of RCC: -/93
End of Project: -/94
Specifications
Height: 34 metres
Length: 296 metres
Volume of RCC: 69 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | No pozzolan used - |

Details
Country: Brazil
Owner: SUPLAN/PB
Type: Gravity
Purpose(s): Water Supply
River: Picuí
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 10/94
End of Project: -/95
Specifications
Height: 31 metres
Length: 135 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba
Type: Gravity
Purpose(s): Irrigation
River: Cova da Mandioca
Reservoir capacity: 126 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/94
End of Project: 12/94
Specifications
Height: 32 metres
Length: 360 metres
Volume of RCC: 75 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | No pozzolan used - |

Details
Country: Brazil
Owner: Companhia Pernambucana de Saceamento
Type: Gravity
Purpose(s): Water Supply
River: Do Prata
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: 12/94
End of Project: -/95
Specifications
Height: 26 metres
Length: 405 metres
Volume of RCC: 61 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
[stepped face] |
Spillway
Slope | Type |
---|---|
[stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: SRH/CE (Secretaria de Rewrsos Hidricos-CE)
Type: Gravity
Purpose(s): Water Supply
River: Saõ Gonçalo
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 05/95
End of Project: -/96
Specifications
Height: 51 metres
Length: 116 metres
Volume of RCC: 87 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Paraíba
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 79 metres
Length: 674 metres
Volume of RCC: 674 m3x103
Total volume: 734 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Brennand Energia
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 238 metres
Volume of RCC: 96 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Brennand Energia
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 250 metres
Volume of RCC: 105 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Secretaria Estadual do Meio Ambiente e Recursos Hídricos do RN
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Seridó
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 26 metres
Length: 458 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia)
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 02/96
End of Project: 09/96
Specifications
Height: 95 metres
Length: 550 metres
Volume of RCC: 570 m3x103
Total volume: 647 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.74 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.74 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Copel Geração e Transmissão S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: -/96
End of Project: 12/97
Specifications
Height: 66 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CPEE (Companhia Paulista de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: Do Peixe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 02/96
Start of RCC: 02/96
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 32 metres
Length: 300 metres
Volume of RCC: 20 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
120 |
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |

Details
Country: Brazil
Owner: Saneamento de Goiás S/A
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/86
Start of RCC: -/86
End of RCC: -/97
End of Project: -/97
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: 129 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 56 metres
Length: 420 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia)
Type: Gravity
Purpose(s): Hydropower
River: Iguaçu
Reservoir capacity: 3573 m3x106
Construction Dates
Start of Project: 02/95
Start of RCC: 02/95
End of RCC: 07/98
End of Project: 12/98
Specifications
Height: 67 metres
Length: 1083 metres
Volume of RCC: 912 m3x103
Total volume: 1438 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ibicui-Mirim
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 07/97
Start of RCC: 07/97
End of RCC: 07/98
End of Project: 11/98
Specifications
Height: 37 metres
Length: 675 metres
Volume of RCC: 69 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Secas)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Capiibaribe
Reservoir capacity: 286 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 10/98
End of Project: -/99
Specifications
Height: 63 metres
Length: 442 metres
Volume of RCC: 472 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Arroio Burati
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: 07/99
End of Project: -/00
Specifications
Height: 29 metres
Length: 219 metres
Volume of RCC: 80 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Empresas de Electricidade Vale Paranapanema
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 09/99
End of Project: -/00
Specifications
Height: 37 metres
Length: 212 metres
Volume of RCC: 45 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
45 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
55 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Water Supply
River: Itapicuru-açu
Reservoir capacity: 39 m3x106
Construction Dates
Start of Project: 05/98
Start of RCC: 05/98
End of RCC: 12/99
End of Project: 02/00
Specifications
Height: 32 metres
Length: 266 metres
Volume of RCC: 90 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Belgo Mineira-Samarco
Type: Gravity
Purpose(s): Hydropower
River: Piracicaba
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/99
End of Project: -/00
Specifications
Height: 41 metres
Length: 499 metres
Volume of RCC: 85 m3x103
Total volume: 102 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Eletronorte SA
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: -
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 09/00
End of Project: 10/05
Specifications
Height: 78 metres
Length: 1541 metres
Volume of RCC: 88 m3x103
Total volume: 8800 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
RCC against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Dona Francisca Energértica SA
Type: Gravity
Purpose(s): Hydropower
River: Jacuí
Reservoir capacity: 335 m3x106
Construction Dates
Start of Project: 08/98
Start of RCC: 08/98
End of RCC: 10/00
End of Project: 12/00
Specifications
Height: 63 metres
Length: 670 metres
Volume of RCC: 485 m3x103
Total volume: 665 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Secretaria Estadual do Meio Ambiente e Recursos Hídricos do RN
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Apodi
Reservoir capacity: 600 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/00
End of Project: -/01
Specifications
Height: 58 metres
Length: 1660 metres
Volume of RCC: 1023 m3x103
Total volume: 1120 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: Companhia Pernambucana de Saneamento
Type: Gravity
Purpose(s): Water Supply
River: Tiúma
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 01/01
End of Project: 05/01
Specifications
Height: 16 metres
Length: 290 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Companhia Energética Mercosul (of the Tractebel Group)
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 10/01
End of Project: 10/02
Specifications
Height: 71 metres
Length: 510 metres
Volume of RCC: 527 m3x103
Total volume: 833 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
40 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: DNOCS/Minas Gerais
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Congonhas
Reservoir capacity: 800 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 12/01
End of Project: -/02
Specifications
Height: 85 metres
Length: 668 metres
Volume of RCC: 890 m3x103
Total volume: 1030 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: Investco (Tractebel)
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 4982 m3x106
Construction Dates
Start of Project: 07/98
Start of RCC: 07/98
End of RCC: 12/01
End of Project: 12/02
Specifications
Height: 43 metres
Length: 2100 metres
Volume of RCC: 188 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
30 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
40 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: do Carmo
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/01
Specifications
Height: 42 metres
Length: 2308 metres
Volume of RCC: 644 m3x103
Total volume: 658 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: Aliança Geração de Energia SA
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 285 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 12/02
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Itapicuru
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 220 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
34 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
41 | No pozzolan used - |

Details
Country: Brazil
Owner: CAGEPE (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Pirapama
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 25 metres
Length: 300 metres
Volume of RCC: 87 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | No pozzolan used - |

Details
Country: Brazil
Owner: Ceste
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Curimatá
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 11/02
Specifications
Height: 26 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Estado da Paraiba (Companhia de Aguas e Esgotus)
Type: Gravity
Purpose(s): Water Supply
River: Riachäo
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 06/02
End of Project: -/02
Specifications
Height: 50 metres
Length: 465 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: Secretaria Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Quixeré
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: 11/02
End of Project: -/03
Specifications
Height: 19 metres
Length: 200 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
[stepped face] |
Spillway
Slope | Type |
---|---|
[stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/02
Specifications
Height: 15 metres
Length: -
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CASAN (Companhia Catarinense de Águas e Saneamento)
Type: Gravity
Purpose(s): Hydropower
River: Rio São Bento
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 41 metres
Length: 240 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.80 |
Spillway
Slope | Type |
---|---|
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Hardfill
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 18 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Tangará Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Guaporé
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 32 metres
Length: 152 metres
Volume of RCC: -
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%)
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 51 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: GEFAC
Type: Gravity
Purpose(s): Hydropower
River: Sao Marcos
Reservoir capacity: -
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/05
Specifications
Height: 80 metres
Length: 326 metres
Volume of RCC: 610 m3x103
Total volume: 742 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: Das Antas
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 04/02
Start of RCC: 04/02
End of RCC: -/04
End of Project: 12/04
Specifications
Height: 33 metres
Length: 232 metres
Volume of RCC: 35 m3x103
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: SANEAGO-Saneamento de Goiás S.A.
Type: Gravity
Purpose(s): Water Supply
River: João Leite
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: 03/01
Start of RCC: 03/01
End of RCC: -/04
End of Project: -/04
Specifications
Height: 55 metres
Length: 380 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Novelis do Brasil Ltda
Type: Gravity
Purpose(s): Hydropower
River: Doce
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 05/01
Start of RCC: 05/01
End of RCC: -/04
End of Project: 05/05
Specifications
Height: 53 metres
Length: 311 metres
Volume of RCC: 236 m3x103
Total volume: 356 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
40 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-aço
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 46 metres
Length: 209 metres
Volume of RCC: 75 m3x103
Total volume: 91 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Paraguaçu
Reservoir capacity: 122 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 20 metres
Length: 320 metres
Volume of RCC: 75 m3x103
Total volume: 87 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Elejor Centrais Elétricas do Rio Jordåo
Type: Gravity
Purpose(s): Hydropower
River: Jordåo
Reservoir capacity: 431 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: -/04
End of Project: 01/05
Specifications
Height: 67 metres
Length: 588 metres
Volume of RCC: 438 m3x103
Total volume: 504 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
40 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: BAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética)
Type: Gravity
Purpose(s): Hydropower
River: Pelotas
Reservoir capacity: 50000 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/05
End of Project: -/06
Specifications
Height: 85 metres
Length: 665 metres
Volume of RCC: 100 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Votorantim S.A.
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/06
Specifications
Height: 32 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Hydropower
River: Chopin
Reservoir capacity: -
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/05
End of Project: -/05
Specifications
Height: 16 metres
Length: 225 metres
Volume of RCC: 15 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Enerpeixa S/A
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 2741 m3x106
Construction Dates
Start of Project: 04/02
Start of RCC: 04/02
End of RCC: -/05
End of Project: 09/06
Specifications
Height: 39 metres
Length: 400 metres
Volume of RCC: 500 m3x103
Total volume: 582 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: CJ Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 20 metres
Length: 120 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Usina Olho de’Água
Type: Gravity
Purpose(s): Irrigation
River: Itambé
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 27 metres
Length: 306 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
[stepped face] |
Spillway
Slope | Type |
---|---|
[stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba)
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 29 metres
Length: 540 metres
Volume of RCC: 58 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Maue Geradora
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: -/06
End of Project: 10/06
Specifications
Height: 19 metres
Length: 245 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/06
End of Project: -/06
Specifications
Height: 19 metres
Length: -
Volume of RCC: 15 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Concessionária Mosquitão S/A
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 32 metres
Length: 236 metres
Volume of RCC: 57 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: ELEJOR - Centrais Elétricas do Rio Jordão
Type: Gravity
Purpose(s): Hydropower
River: Jordao
Reservoir capacity: 34 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 43 metres
Length: 445 metres
Volume of RCC: 200 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 34 metres
Length: 172 metres
Volume of RCC: 44 m3x103
Total volume: 51 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.80 |
Spillway
Slope | Type |
---|---|
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: 142 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 04/07
Specifications
Height: 29 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
1.50 |
Downstream
Slope | Type |
---|---|
1.50 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: Das Antas
Reservoir capacity: 92 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 02/08
Specifications
Height: 45 metres
Length: 350 metres
Volume of RCC: 240 m3x103
Total volume: 322 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
1.30 |
Spillway
Slope | Type |
---|---|
1.30 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: Das Antas
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 10/08
Specifications
Height: 37 metres
Length: 281 metres
Volume of RCC: 75 m3x103
Total volume: 212 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
1.30 |
Spillway
Slope | Type |
---|---|
1.30 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Companhia Pernambucana de Saneamento
Type: Gravity
Purpose(s): Flood Control
River: Duas Serras
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 19 metres
Length: 113 metres
Volume of RCC: 6 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/07
End of Project: -/07
Specifications
Height: 16 metres
Length: 196 metres
Volume of RCC: 21 m3x103
Total volume: 41 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 02/08
Specifications
Height: 38 metres
Length: 173 metres
Volume of RCC: 42 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
19 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Veneto Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 04/08
Specifications
Height: 25 metres
Length: 220 metres
Volume of RCC: 31 m3x103
Total volume: 61 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Linha Emília Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: -/08
Specifications
Height: 30 metres
Length: 205 metres
Volume of RCC: 35 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Santa Laura S/A
Type: Gravity
Purpose(s): Hydropower
River: Chapecozinho
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 27 metres
Length: -
Volume of RCC: 24 m3x103
Total volume: 42 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Santa Rosa S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 31 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Hidrelétrica Cachoeirão SA
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/08
Specifications
Height: 23 metres
Length: 90 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/08
Specifications
Height: 44 metres
Length: 270 metres
Volume of RCC: 14 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
2.50 |
Downstream
Slope | Type |
---|---|
2 |
Spillway
Slope | Type |
---|---|
2 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: São Simão Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Itapemirim
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 02/09
Specifications
Height: 56 metres
Length: 187 metres
Volume of RCC: 92 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Lumbrás Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Garcia
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 03/09
Specifications
Height: 45 metres
Length: 178 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: BME Energia SA
Type: Gravity
Purpose(s): Hydropower
River: Ivaí
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 40 metres
Length: 227 metres
Volume of RCC: 58 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 05/09
Specifications
Height: 15 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Goiás Sul Geração de Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Verissimo
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/08
End of Project: 05/09
Specifications
Height: 44 metres
Length: 341 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Velcan Energy Development Ltda.
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 01/10
Specifications
Height: 32 metres
Length: 223 metres
Volume of RCC: -
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.85 |
Spillway
Slope | Type |
---|---|
0.85 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: BME Energia
Type: Gravity
Purpose(s): Hydropower
River: Ivaí
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 23 metres
Length: 220 metres
Volume of RCC: 29 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/09
Specifications
Height: 42 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: de Contas
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/09
End of Project: -/10
Specifications
Height: 18 metres
Length: 337 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Säo Pedro Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Jacu Braço Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 30 metres
Length: 140 metres
Volume of RCC: 22 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Criúva Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Lajeado Grange
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: 12/09
Specifications
Height: 23 metres
Length: 246 metres
Volume of RCC: 80 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Hidrelétrica Areia Branca S.A. (Tractebel Energia)
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: -/09
Specifications
Height: 28 metres
Length: 257 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Serrana Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Lajeado Grande
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 01/10
Specifications
Height: 32 metres
Length: 137 metres
Volume of RCC: 89 m3x103
Total volume: 103 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tijuco
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 03/10
Specifications
Height: 23 metres
Length: 156 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: COMDEP
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Parnaiba
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 48 metres
Length: 806 metres
Volume of RCC: 506 m3x103
Total volume: 630 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Gerdau SA
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Claro
Reservoir capacity: -
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/09
End of Project: 07/10
Specifications
Height: 15 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Companhia Energetica de Sao Paulo
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 30 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Energética Campos de Cima da Serra Ltda
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 31 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Gerdau SA
Type: Gravity
Purpose(s): Hydropower
River: Claro
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Centrais Elétricas do Rio Jordão S/A
Type: Gravity
Purpose(s): Hydropower
River: Mucuri
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 72 metres
Length: 242 metres
Volume of RCC: 520 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | |

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: 04/10
Specifications
Height: 39 metres
Length: 250 metres
Volume of RCC: 53 m3x103
Total volume: 81 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Andrade Galvão Engenharia Ltda.
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: 10/10
Specifications
Height: 28 metres
Length: 1000 metres
Volume of RCC: -
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Eletrogoes S/A.
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 478 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 19 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CPFL Renovabeis
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 34 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: 12/10
Specifications
Height: 28 metres
Length: 170 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.43 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Hidrolétrica Pipoca S/A
Type: Gravity
Purpose(s): Hydropower
River: Santo Antonio
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Ibirama Energética SA
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: Santo Antônio
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: 94 metres
Volume of RCC: -
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Energisa Geracao Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: 03/11
Specifications
Height: 38 metres
Length: 220 metres
Volume of RCC: 66 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: BME
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: -
Construction Dates
Start of Project: 12/07
Start of RCC: 12/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 28 metres
Length: -
Volume of RCC: 85 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Water Supply
River: Pajeú
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: 566 metres
Volume of RCC: 64 m3x103
Total volume: 92 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: SPE São Gonçalo Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Santa Bárbara
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 28 metres
Length: 154 metres
Volume of RCC: 14 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Furnas Centrais Elétricas S/A.
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 30 metres
Length: 260 metres
Volume of RCC: -
Total volume: 94 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: Corrente Grande
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/10
End of Project: -/10
Specifications
Height: 30 metres
Length: 115 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/10
End of Project: -/10
Specifications
Height: 30 metres
Length: -
Volume of RCC: 42 m3x103
Total volume: 73 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Consorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA)
Type: Gravity
Purpose(s): Hydropower
River: Tibagi
Reservoir capacity: 84 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 05/11
End of Project: -/12
Specifications
Height: 85 metres
Length: 745 metres
Volume of RCC: 633 m3x103
Total volume: 753 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2400 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Furnas
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: 114 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 12/11
Specifications
Height: 30 metres
Length: 270 metres
Volume of RCC: 44 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Statkraft
Type: Gravity
Purpose(s): Hydropower
River: Bernado Jose
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 22 metres
Length: -
Volume of RCC: 9 m3x103
Total volume: 25 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Autódromo Energética S/A
Type: Gravity
Purpose(s): unknown
River: Carreiro
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/11
End of Project: -/11
Specifications
Height: 23 metres
Length: 200 metres
Volume of RCC: 21 m3x103
Total volume: 47 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
67 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Boa Fé Energética
Type: Gravity
Purpose(s): Hydropower
River: Carrero
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/11
End of Project: -/11
Specifications
Height: 26 metres
Length: 198 metres
Volume of RCC: 32 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Energisa Geracao Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 44 metres
Length: 285 metres
Volume of RCC: 81 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Energisa Geracao Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 40 metres
Length: 200 metres
Volume of RCC: 51 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Boa Sorte Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Tijucas
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/12
End of Project: -/12
Specifications
Height: 26 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Passo Maia Energética S.A. (Adami, Desenvix, Statkraft)
Type: Gravity
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 09/12
Specifications
Height: 34 metres
Length: -
Volume of RCC: 66 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: SAMAE
Type: Gravity
Purpose(s): Water Supply
River: Marrecas
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: -/12
End of Project: 12/12
Specifications
Height: 35 metres
Length: 430 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Água Limpa Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Palmeiras
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/12
Specifications
Height: 79 metres
Length: 674 metres
Volume of RCC: 42 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CTG Brasil
Type: Gravity
Purpose(s): unknown
River: Sapucai
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 07/13
Specifications
Height: 15 metres
Length: 482 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CTG Brasil (previously Triunfo Engergia)
Type: Gravity
Purpose(s): Hydropower
River: Canoas
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 09/13
Specifications
Height: 40 metres
Length: 490 metres
Volume of RCC: 264 m3x103
Total volume: 382 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Estado do Ceará
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 15 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Centrais Hidrelétricas Grapon S/A
Type: Gravity
Purpose(s): Hydropower
River: Pomba
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 32 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Pezzi Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: -
Volume of RCC: 44 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
76 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
19 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Serra dos Cavalinhos II Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: -
Volume of RCC: 33 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 23 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas SA
Type: Gravity
Purpose(s): Hydropower
River: Caneiras
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: 11/13
Specifications
Height: 24 metres
Length: 273 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas S/A
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Braço do Norte
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/13
Specifications
Height: 21 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 303 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 66 metres
Length: 1015 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: ANEEL (Agência Nacional de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/11
Start of RCC: 07/11
End of RCC: -/15
End of Project: 09/16
Specifications
Height: 80 metres
Length: 360 metres
Volume of RCC: 500 m3x103
Total volume: 1020 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Secretária de Desenvolvimento Econômico
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 61 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Preto
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/15
End of Project: 04/16
Specifications
Height: 44 metres
Length: 272 metres
Volume of RCC: 45 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
1.25 |
Downstream
Slope | Type |
---|---|
1.25 |
Spillway
Slope | Type |
---|---|
1.25 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Itamarati Norte S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jubinha
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/15
End of Project: -/15
Specifications
Height: 21 metres
Length: 1540 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Itamarati Norte S.A.
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/15
End of Project: -/15
Specifications
Height: 26 metres
Length: 570 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Projeto Transposição das Águas do Rio São Francisco
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/16
Specifications
Height: 18 metres
Length: 196 metres
Volume of RCC: 52 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Norte Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Xingu
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/16
End of Project: -/20
Specifications
Height: 74 metres
Length: 680 metres
Volume of RCC: 63 m3x103
Total volume: 2208 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
1.20 |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: São Roque Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Canoas
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/18
End of Project: -/19
Specifications
Height: 68 metres
Length: 151 metres
Volume of RCC: 100 m3x103
Total volume: 583 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 | [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Cemig Geração e Transmissão SA and Itaocara Energia Ltda
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: 1700 m3x106
Construction Dates
Start of Project: 01/16
Start of RCC: 01/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: Secretária de Desenvolvimento Econômico
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 06/19
End of Project: -/20
Specifications
Height: 55 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 05/08
Start of RCC: 05/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 33 metres
Length: 330 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: FUNCATE-Fundação de Ciência,Aplicações e Tecnologia Espaciais
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 495 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/19
End of Project: -/20
Specifications
Height: 35 metres
Length: 249 metres
Volume of RCC: 56 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates