NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Gibe IIIEthiopiaHOmo1469004/0812/1110/15- /16246630620064000.25(3')1.00(3')*1.00(3')*40040070 to  12045 to  60(S)
Grand Ethiopian Renaissance Dam Project (GERDP)EthiopiaHBlue Nile7400012/1005/13- /22- /24160179010100105000.22(3')1.00(3')*1.00(3')*40040067 to  10523 to  35(N)
Koysha (Gibe IV)EthiopiaHOmo1470009/1306/20- /23- /241681000740074000.10
0.35
(3')0.70(3')*separate 40040057 to  9923 to  41(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Ethiopia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Omo

Reservoir capacity: 14690 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 10/15

End of Project: -/16

Specifications

Height: 246 metres

Length: 630 metres

Volume of RCC: 6200 m3x103

Total volume: 6400 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
70  to
Pozzolan (kg/m3)Pozzolan Type
45  toGround-granulated blast-furnace slag
  
Gibe III completed
Gibe III completed

Full Dam Information

Details

Country: Ethiopia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Blue Nile

Reservoir capacity: 74000 m3x106

Construction Dates

Start of Project: 12/10

Start of RCC: 12/10

End of RCC: -/22

End of Project: -/24

Specifications

Height: 160 metres

Length: 1790 metres

Volume of RCC: 10100 m3x103

Total volume: 10500 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.22RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
67  to
Pozzolan (kg/m3)Pozzolan Type
23  toNatural pozzolan (ASTM Class N)
  
Grand Ethiopian Renaissance Dam Project (GERDP) completed
Grand Ethiopian Renaissance Dam Project (GERDP) completed

Full Dam Information

Details

Country: Ethiopia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Omo

Reservoir capacity: 14700 m3x106

Construction Dates

Start of Project: 09/13

Start of RCC: 09/13

End of RCC: -/23

End of Project: -/24

Specifications

Height: 168 metres

Length: 1000 metres

Volume of RCC: 7400 m3x103

Total volume: 7400 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against formwork (GEVR/GE-RCC)
0.35 
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
57  to
Pozzolan (kg/m3)Pozzolan Type
23  toNatural pozzolan (ASTM Class N)
  
Koysha (Gibe IV) under construction