Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Safad | UAE | G I | 1 | - /00 | 05/01 | 06/01 | - /01 | 19 | 100 | 9 | 10 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 0 | (-) - | ||
Showkah | UAE | G I | 1 | - /00 | 08/01 | 10/01 | - /01 | 24 | 105 | 18 | 20 | 0.10 | (11) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 0 | (-) - | ||
Hatta Upper Saddle | UAE | H | 12/19 | 03/21 | 09/21 | - /24 | 38 | 184 | 41 | 45 | (7) | (7) | (7)* | 300 | 300 | 65 | 120 | (F) | ||||||
Hatta Upper | UAE | H | 12/19 | 11/21 | 08/22 | - /24 | 70 | 222 | 170 | 180 | (7) | (7) | none | 300 | 300 | 65 | 120 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: UAE
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: 06/01
End of Project: -/01
Specifications
Height: 19 metres
Length: 100 metres
Volume of RCC: 9 m3x103
Total volume: 10 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: UAE
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: 10/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 105 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 | Reinforced conventional concrete cast before RCC placement |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: UAE
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 12/19
Start of RCC: 12/19
End of RCC: 09/21
End of Project: -/24
Specifications
Height: 38 metres
Length: 184 metres
Volume of RCC: 41 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
RCC against precast concrete panels |
Spillway
Slope | Type |
---|---|
RCC against precast concrete panels [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |
Details
Country: UAE
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 12/19
Start of RCC: 12/19
End of RCC: 08/22
End of Project: -/24
Specifications
Height: 70 metres
Length: 222 metres
Volume of RCC: 170 m3x103
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
RCC against precast concrete panels |
Spillway
Slope | Type |
---|---|
none |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |
Search again