Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Santa Clara Almorés-MGBrazilHMucuri151- /07- /08- /09- /1072242520600      300300 0 
Dashte PalangIranF I WDashte Palang15107/13- /22- /24- /2556350540690           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Mucuri

Reservoir capacity: 151 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 72 metres

Length: 242 metres

Volume of RCC: 520 m3x103

Total volume: 600 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
0 
  
Santa Clara Almorés-MG completed
Santa Clara Almorés-MG completed

Full Dam Information

Details

Country: Iran

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Dashte Palang

Reservoir capacity: 151 m3x106

Construction Dates

Start of Project: 07/13

Start of RCC: 07/13

End of RCC: -/24

End of Project: -/25

Specifications

Height: 56 metres

Length: 350 metres

Volume of RCC: 540 m3x103

Total volume: 690 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dashte Palang under construction
Dashte Palang under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates