SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
CenzaSpainHCenza4301/9203/9308/9312/9349609200225V(3)0.122
0.75
(3)*
(3)*
0.75(3)*30030070130(F)
MeanderAustraliaI WMeander4301/0601/0708/0712/07471808585V(4)0.70(10)0.70(10)300300700(-) -
KasimlarTurkeyHAyvalı43- /12- /13- /15- /1690235330            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Cenza

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: 01/92

Start of RCC: 01/92

End of RCC: 08/93

End of Project: 12/93

Specifications

Height: 49 metres

Length: 609 metres

Volume of RCC: 200 m3x103

Total volume: 225 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.122RCC against formwork  [stepped face]
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
Cenza completed
Cenza completed

Full Dam Information

Details

Country: Australia

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Meander

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 08/07

End of Project: 12/07

Specifications

Height: 47 metres

Length: 180 metres

Volume of RCC: 85 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
Downstream
SlopeType
0.70RCC against precast concrete blocks
Spillway
SlopeType
0.70RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Meander completed
Meander completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ayvalı

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: -/16

Specifications

Height: 90 metres

Length: 235 metres

Volume of RCC: 330 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  