Dam Search Results
- Reservoir Capacity: 83 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Guoduo | China | H | Zaqu | 83 | - /12 | - /13 | - /15 | - /16 | 93 | 236 | 550 | |||||||||||||
Kafue Gorge Lower (KGL) | Zambia | H | Kafue | 83 | 01/16 | 06/18 | 04/20 | - /20 | 131 | 375 | 1290 | 1390 | 0.20 | (3') | 0.75 | (3') | 0.75 | (12) | 300 | 300 | 60 | 112 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Zaqu
Reservoir capacity: 83 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 93 metres
Length: 236 metres
Volume of RCC: -
Total volume: 550 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Zambia
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Kafue
Reservoir capacity: 83 m3x106
Construction Dates
Start of Project: 01/16
Start of RCC: 01/16
End of RCC: 04/20
End of Project: -/20
Specifications
Height: 131 metres
Length: 375 metres
Volume of RCC: 1290 m3x103
Total volume: 1390 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
112 | Low-lime flyash (ASTM Class F) |