Dam Search Results
- Dimensions
- Height: 123 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Gassan | Japan | F H I W | Bonji | 65 | 08/88 | 06/94 | 10/98 | 03/01 | 123 | 393 | 731 | 1160 | V | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) | |
| Porce II | Colombia | H | Porce | 211 | 11/94 | 12/96 | 09/00 | 03/01 | 123 | 425 | 1305 | 1445 | 0.10 | (14) | 0.35 0.75 | (14)* | 0.75 | (13) | 300 | 300 | 132 120 | 88 80 | (N) | |
| Yongdingqiao | China | Liushahe | 17 | - /05 | - /07 | - /10 | - /12 | 123 | ||||||||||||||||
| Huangzangsi | China | Heihe | 403 | - /16 | 08/20 | - /22 | - /23 | 123 | ||||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Bonji
Reservoir capacity: 65 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: 10/98
End of Project: 03/01
Specifications
Height: 123 metres
Length: 393 metres
Volume of RCC: 731 m3x103
Total volume: 1160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork | 
Spillway
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 250 | 750 | 
| 1000 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 91 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 39 | Low-lime flyash (ASTM Class F) | 

Details
Country: Colombia
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Porce
Reservoir capacity: 211 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 09/00
End of Project: 03/01
Specifications
Height: 123 metres
Length: 425 metres
Volume of RCC: 1305 m3x103
Total volume: 1445 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| 0.10 | Slip-formed/extruded facing elements | 
Downstream
| Slope | Type | 
|---|---|
| 0.35 | Slip-formed/extruded facing elements [stepped face] | 
| 0.75 | 
Spillway
| Slope | Type | 
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 132 | 
| 120 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 88 | Natural pozzolan (ASTM Class N) | 
| 80 | 

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Liushahe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 123 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Heihe
Reservoir capacity: 403 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/23
Specifications
Height: 123 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
