Dam Search Results
- Dimensions
- Height: 146 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Murum | Malaysia | H | Murum | 12043 | 10/08 | 05/10 | 07/13 | - /15 | 146 | 440 | 1520 | 1660 | V 0.20 | (3') (3') | 0.70 0.80 | (3) | 0.70 0.80 | 300 | 3000 | 88 65 | 88 72 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Malaysia
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Murum
Reservoir capacity: 12043 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 07/13
End of Project: -/15
Specifications
Height: 146 metres
Length: 440 metres
Volume of RCC: 1520 m3x103
Total volume: 1660 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork |
0.80 |
Spillway
Slope | Type |
---|---|
0.70 | |
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
88 |
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
88 | Low-lime flyash (ASTM Class F) |
72 |