Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Tirgu JiuRomaniaHJiu208/8606/8805/8912/9324611326 (12) (12)ogee(12)3009001250(-) -
Burguillos del CerroSpainWRibera de los Montes312/9005/9109/9112/91241672533V(14)0.13
0.60
(14)*0.60(13)*30030080135(F)
Zanja HondaColombiaIChenche - /97- /98- /99- /0024 75         750(-) -
ShowkahUAEG I 1- /0008/0110/01- /012410518200.10(11)0.80(1)*0.80(12)300300900(-) -
Pedras AltasBrazilF I R WItapicuru - /00- /00- /01- /012410904260      3003003441(-) -
ChibkaMoroccoIChbika2- /04- /06- /08- /0924              
João BorgesBrazilHCaneiras - /12- /12- /1311/1324273             
Singrobo-AhouatyIvory CoastHBandama10510/19- /21- /2203/2324              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Romania

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jiu

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 08/86

Start of RCC: 08/86

End of RCC: 05/89

End of Project: 12/93

Specifications

Height: 24 metres

Length: 61 metres

Volume of RCC: 13 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Tirgu Jiu on Google Earth
Tirgu Jiu on Google Earth

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Ribera de los Montes

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 12/90

Start of RCC: 12/90

End of RCC: 09/91

End of Project: 12/91

Specifications

Height: 24 metres

Length: 167 metres

Volume of RCC: 25 m3x103

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalSlip-formed/extruded facing elements
Downstream
SlopeType
0.13Slip-formed/extruded facing elements  [stepped face]
0.60 
Spillway
SlopeType
0.60Reinforced concrete cast against precast units or slip-formed facing elements  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
135Low-lime flyash (ASTM Class F)
  
Burguillos del Cerro completed
Burguillos del Cerro completed

Full Dam Information

Details

Country: Colombia

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Chenche

Reservoir capacity: -

Construction Dates

Start of Project: -/97

Start of RCC: -/97

End of RCC: -/99

End of Project: -/00

Specifications

Height: 24 metres

Length: -

Volume of RCC: 75 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Photo coming soon

Full Dam Information

Details

Country: UAE

Owner: -

Type: Gravity

Purpose(s): Groundwater Recharge / Irrigation

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: 10/01

End of Project: -/01

Specifications

Height: 24 metres

Length: 105 metres

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Reinforced conventional concrete cast before RCC placement
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Showkah completed
Showkah completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Recreation / Water Supply

River: Itapicuru

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/01

End of Project: -/01

Specifications

Height: 24 metres

Length: 1090 metres

Volume of RCC: 42 m3x103

Total volume: 60 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
34
Pozzolan (kg/m3)Pozzolan Type
41No pozzolan used  -
  
Pedras Altas completed
Pedras Altas completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Chbika

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/08

End of Project: -/09

Specifications

Height: 24 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Chibka on Google Earth
Chibka on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Caneiras

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: 11/13

Specifications

Height: 24 metres

Length: 273 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
João Borges completed
João Borges completed

Full Dam Information

Details

Country: Ivory Coast

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bandama

Reservoir capacity: 105 m3x106

Construction Dates

Start of Project: 10/19

Start of RCC: 10/19

End of RCC: -/22

End of Project: 03/23

Specifications

Height: 24 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Singrobo-Ahouaty on Google Earth
Singrobo-Ahouaty on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates