Dam Search Results
- Dimensions
- Height: 54 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Sierra Brava | Spain | I | Pizarroso | 232 | 12/90 | 06/92 | 11/93 | 12/93 | 54 | 835 | 277 | 340 | 0.05 | (14) | 0.75 | (14)* | 0.75 | (14)* | 300 | 300 | 80 | 140 | (F) | |
| Nacaome | Honduras | W | Rio Grande Nacaome | 42 | 06/93 | 08/94 | - /95 | - /95 | 54 | 320 | 250 | 300 | 0.15 | (2) | 0.80 | (3)* | 0.80 | (12)* | 400 | 400 | 64 | 21 | (N) | |
| Bab Louta | Morocco | W | Bous Sbaa | 37 | 01/97 | 02/98 | 02/99 | 03/99 | 54 | 110 | 63 | 77 | V | (5) | 0.75 | (1)* | 0.75 | (13) | 300 | 300 | 65 80 | 15 20 | (N) | |
| Huilong PSS - Upper dam | China | H | 1 | 06/01 | 11/02 | 11/03 | - /05 | 54 | 208 | 73 | 76 | V | (3') | 0.75 | (3') | none | 300 | 300 | (F) | |||||
| Huilong PSS - Lower dam | China | H | 2 | 06/01 | - /02 | 06/04 | - /05 | 54 | 175 | 88 | 105 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | (F) | ||||
| Shiti | China | H | Youshui | 163 | - /05 | - /06 | - /07 | - /07 | 54 | 214 | 260 | |||||||||||||
| Bogovina | Serbia | F H I W | Cmi Timok | 48 | - /12 | - /14 | - /15 | - /16 | 54 | 396 | 175 | 305 | ||||||||||||
| Ardil | Turkey | I | Ardil | 11 | 03/13 | 05/14 | 12/16 | 02/17 | 54 | 266 | 108 | 158 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 75 | 75 | ||
| Guanchang | China | H I W | w | 24 | - /14 | - /15 | - /16 | - /17 | 54 | 246 | ||||||||||||||
| Patuca 3 | Honduras | H | Patuca | 208 | - /12 | - /16 | 02/17 | - /19 | 54 | 160 | 120 | 160 | 0.20 | (1) | 0.75 | (1) | 0.75 | (12) | 300 | 3000 | 107 | 57 | (N) | |
| Ergani | Turkey | I | Golkum | 15 | - /14 | - /16 | - /17 | - /18 | 54 | 229 | 127 | 161 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 90 | 60 | (F) | ||
| Tersun | Turkey | I | Tersun | 9 | - /16 | - /20 | - /22 | - /24 | 54 | 273 | 205 | 0.05 | (1) | 0.80 | (1) | |||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Pizarroso
Reservoir capacity: 232 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 11/93
End of Project: 12/93
Specifications
Height: 54 metres
Length: 835 metres
Volume of RCC: 277 m3x103
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Rio Grande Nacaome
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 06/93
Start of RCC: 06/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 54 metres
Length: 320 metres
Volume of RCC: 250 m3x103
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 21 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Bous Sbaa
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 01/97
Start of RCC: 01/97
End of RCC: 02/99
End of Project: 03/99
Specifications
Height: 54 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 11/03
End of Project: -/05
Specifications
Height: 54 metres
Length: 208 metres
Volume of RCC: 73 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 06/04
End of Project: -/05
Specifications
Height: 54 metres
Length: 175 metres
Volume of RCC: 88 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Youshui
Reservoir capacity: 163 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/07
Specifications
Height: 54 metres
Length: 214 metres
Volume of RCC: -
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Serbia
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Cmi Timok
Reservoir capacity: 48 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 54 metres
Length: 396 metres
Volume of RCC: 175 m3x103
Total volume: 305 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Ardil
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 03/13
Start of RCC: 03/13
End of RCC: 12/16
End of Project: 02/17
Specifications
Height: 54 metres
Length: 266 metres
Volume of RCC: 108 m3x103
Total volume: 158 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 75 | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: w
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 54 metres
Length: 246 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Honduras
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Patuca
Reservoir capacity: 208 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: 02/17
End of Project: -/19
Specifications
Height: 54 metres
Length: 160 metres
Volume of RCC: 120 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 57 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Golkum
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 54 metres
Length: 229 metres
Volume of RCC: 127 m3x103
Total volume: 161 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Tersun
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/24
Specifications
Height: 54 metres
Length: 273 metres
Volume of RCC: 205 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates