Dam Search Results
- Dimensions
- Height: 73 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Toker | Eritrea | Government of Eritrea | W | Toker | 14 | 11/96 | 02/98 | 05/99 | 08/99 | 73 | 263 | 187 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (12)* | 330 | 330 | 110 | 85 | (F) |
Zhouning | China | Mindong Electromechanical Development Corporation | H | Muyangxi | 47 | - /02 | 04/03 | 03/04 | 06/04 | 73 | 206 | 159 | 199 | V | (3') | 0.72 | (3') | 0.70 | (12) | 300 | 300 | 67 50 | 100 92 | (F) |
Zhouba | China | Chengdu Haineng Power Co. Ltd. | F H | Mabianhe | 204 | - /04 | - /05 | - /06 | - /07 | 73 | 163 | 229 | 405 | V | (1) | 0.70 | (1) | 0.78 | (1) | 300 | 300 | 110 66 | 73 66 | (F) |
Kirazlıköprü | Turkey | DSI - State Hydraulic Works | H I | 66 | - /99 | - /13 | - /16 | - /17 | 73 | 330 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Eritrea
Owner: Government of Eritrea
Type: Gravity
Purpose(s): Water Supply
River: Toker
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 05/99
End of Project: 08/99
Specifications
Height: 73 metres
Length: 263 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
110 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
85 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Mindong Electromechanical Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Muyangxi
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: 03/04
End of Project: 06/04
Specifications
Height: 73 metres
Length: 206 metres
Volume of RCC: 159 m3x103
Total volume: 199 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.72 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
67 |
50 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
92 |

Details
Country: China
Owner: Chengdu Haineng Power Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Mabianhe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 73 metres
Length: 163 metres
Volume of RCC: 229 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
110 |
66 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
73 | Low-lime flyash (ASTM Class F) |
66 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: -
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/16
End of Project: -/17
Specifications
Height: 73 metres
Length: -
Volume of RCC: 330 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates