Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
TashkumyrKyrgyzstanH INaryn140- /8203/8712/8912/90753201001300V(1)0.78(1)0.78(1)4004009030(N)
Puding
[A]
ChinaH I WSanchahe37703/8906/9205/9302/9475196103137V(1)0.35(1)ogee
0.35
(1)
(1)
30030085
54
103
99
(F)
SuoshaiChinaHSancha420- /89- /90- /93- /9475196 88           
YoshidaJapanF WYoshida207/9107/9302/9503/9675218265304V(1)0.75(1)0.75(1)2507508436(F)
TaolinkouChinaF H I R WQinglonghe85911/9212/9412/97- /98755005851350V
0.15
(1)0.78(1)ogee
0.65
(1)
(1)
300300135
70
70
85
(F)
BaishaChinaF HWanshou199- /04- /05- /06- /0675172211239           
MaojiaheChinaHBeipan13- /06- /07- /08- /08751166             
Wadi DayqahOmanWWadi Dayqah10008/0601/0804/0911/0975410590650V(3')0.75(3')*0.75(3')*3001200126
112
54
48
(M)
Abou Al Abbas Sebti (formerly Taskourt)MoroccoI WAl Mal2501/0804/0909/1004/1175408415490V(5)0.80(1)*0.80(1)*3003007332(N)
Naen
[A]
ChinaHBaidu22- /06- /09- /10- /1175217             
ManghekouChinaBaimang11- /07- /09- /10- /1175215 249           
LidiChinaHLancang75- /10- /14- /18- /1975346 1100           
Cisokan PSS (Lower dam)IndonesiaHCisokan10- /2005/2206/2308/2475294529566      3003004060 
El CarmenNicaraguaHGrande de Matagalpa - /19- /21- /23- /2475   0.70
1.00
(5)
(5)
0.70
1.00
(1)*
(1)*
0.70(1)*     
NtabalangaSouth AfricaI WItsitsa 09/1907/2210/2405/2575240             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Kyrgyzstan

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Naryn

Reservoir capacity: 140 m3x106

Construction Dates

Start of Project: -/82

Start of RCC: -/82

End of RCC: 12/89

End of Project: 12/90

Specifications

Height: 75 metres

Length: 320 metres

Volume of RCC: 100 m3x103

Total volume: 1300 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Tashkumyr on Google Earth
Tashkumyr on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Sanchahe

Reservoir capacity: 377 m3x106

Construction Dates

Start of Project: 03/89

Start of RCC: 03/89

End of RCC: 05/93

End of Project: 02/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: 103 m3x103

Total volume: 137 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.35Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.35Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
54
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
99 
Puding completed
Puding completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Sancha

Reservoir capacity: 420 m3x106

Construction Dates

Start of Project: -/89

Start of RCC: -/89

End of RCC: -/93

End of Project: -/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: -

Total volume: 88 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Yoshida

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 07/91

Start of RCC: 07/91

End of RCC: 02/95

End of Project: 03/96

Specifications

Height: 75 metres

Length: 218 metres

Volume of RCC: 265 m3x103

Total volume: 304 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Yoshida completed
Yoshida completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Qinglonghe

Reservoir capacity: 859 m3x106

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 12/97

End of Project: -/98

Specifications

Height: 75 metres

Length: 500 metres

Volume of RCC: 585 m3x103

Total volume: 1350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.15 
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.65Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
135
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
85 
Taolinkou completed
Taolinkou completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Wanshou

Reservoir capacity: 199 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/06

Specifications

Height: 75 metres

Length: 172 metres

Volume of RCC: 211 m3x103

Total volume: 239 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Baisha completed
Baisha completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/08

Specifications

Height: 75 metres

Length: 1166 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Maojiahe completed
Maojiahe completed

Full Dam Information

Details

Country: Oman

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Wadi Dayqah

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 08/06

Start of RCC: 08/06

End of RCC: 04/09

End of Project: 11/09

Specifications

Height: 75 metres

Length: 410 metres

Volume of RCC: 590 m3x103

Total volume: 650 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
126
112
Pozzolan (kg/m3)Pozzolan Type
54Milled sand
48 
Wadi Dayqah completed
Wadi Dayqah completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Al Mal

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: 01/08

Start of RCC: 01/08

End of RCC: 09/10

End of Project: 04/11

Specifications

Height: 75 metres

Length: 408 metres

Volume of RCC: 415 m3x103

Total volume: 490 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
32Natural pozzolan (ASTM Class N)
  
Abou Al Abbas Sebti (formerly Taskourt) completed
Abou Al Abbas Sebti (formerly Taskourt) completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Baidu

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/10

End of Project: -/11

Specifications

Height: 75 metres

Length: 217 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Baimang

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 75 metres

Length: 215 metres

Volume of RCC: -

Total volume: 249 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Lancang

Reservoir capacity: 75 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/18

End of Project: -/19

Specifications

Height: 75 metres

Length: 346 metres

Volume of RCC: -

Total volume: 1100 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lidi completed
Lidi completed

Full Dam Information

Details

Country: Indonesia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Cisokan

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: 06/23

End of Project: 08/24

Specifications

Height: 75 metres

Length: 294 metres

Volume of RCC: 529 m3x103

Total volume: 566 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
40
Pozzolan (kg/m3)Pozzolan Type
60 
  
Photo coming soon

Full Dam Information

Details

Country: Nicaragua

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Grande de Matagalpa

Reservoir capacity: -

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/23

End of Project: -/24

Specifications

Height: 75 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: South Africa

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Itsitsa

Reservoir capacity: -

Construction Dates

Start of Project: 09/19

Start of RCC: 09/19

End of RCC: 10/24

End of Project: 05/25

Specifications

Height: 75 metres

Length: 240 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates