Dam Search Results
- Dimensions
- Height: 96 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Qinglianxi | China | H | Meixi | 20 | - /00 | - /02 | - /04 | - /06 | 96 | 178 | ||||||||||||||
Song Tranh 2 | Vietnam | H | Song Tranh | 733 | 03/05 | 04/08 | 08/11 | 12/12 | 96 | 640 | 1032 | 1315 | V | (3') | 0.80 | (1) | 0.75 | (1) | 300 | 300 | 70 | 110 | (N) | |
Nam Mo | Vietnam | H | Nam Mo | 272 | - /18 | - /20 | - /22 | - /23 | 96 | 407 | ||||||||||||||
Asuwagawa [A-G] | Japan | F | Beko | 29 | 07/06 | - /18 | - /24 | - /26 | 96 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Meixi
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/06
Specifications
Height: 96 metres
Length: 178 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Song Tranh
Reservoir capacity: 733 m3x106
Construction Dates
Start of Project: 03/05
Start of RCC: 03/05
End of RCC: 08/11
End of Project: 12/12
Specifications
Height: 96 metres
Length: 640 metres
Volume of RCC: 1032 m3x103
Total volume: 1315 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Natural pozzolan (ASTM Class N) |
Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Nam Mo
Reservoir capacity: 272 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/22
End of Project: -/23
Specifications
Height: 96 metres
Length: 407 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Japan
Owner: -
Type: Arch-Gravity
Purpose(s): Flood Control
River: Beko
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/24
End of Project: -/26
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates