Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Castilblanco de los ArroyosSpainWCala107/8405/8510/8512/85251241420V(1)V
0.75
(1)
(1)
0.75(1)45045072
61
116
120
(F)
Ain al KoreimaMoroccoIAkreuch106/8709/8702/8803/882612417200.20(5)*0.20
0.75
(5)
(17)
0.60(1)*35035070
140
30
60
(S)
Lac RobertsonCanadaHHa! Ha!58710/9206/9408/9403/95401242835V(1)0.75(1)*separate 3003008585(F)
Changtan
[A]
ChinaHTuwushui17- /03- /03- /04- /0453124 29           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Cala

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 07/84

Start of RCC: 07/84

End of RCC: 10/85

End of Project: 12/85

Specifications

Height: 25 metres

Length: 124 metres

Volume of RCC: 14 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
450450

Cementitious material

Cement (kg/m3)
72
61
Pozzolan (kg/m3)Pozzolan Type
116Low-lime flyash (ASTM Class F)
120 
Castilblanco de los Arroyos completed
Castilblanco de los Arroyos completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Akreuch

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/87

Start of RCC: 06/87

End of RCC: 02/88

End of Project: 03/88

Specifications

Height: 26 metres

Length: 124 metres

Volume of RCC: 17 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels  [stepped face]
Downstream
SlopeType
0.20Traditional concrete against precast concrete panels
0.75Unformed face of RCC
Spillway
SlopeType
0.60Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
350350

Cementitious material

Cement (kg/m3)
70
140
Pozzolan (kg/m3)Pozzolan Type
30Ground-granulated blast-furnace slag
60 
Ain al Koreima completed
Ain al Koreima completed

Full Dam Information

Details

Country: Canada

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ha! Ha!

Reservoir capacity: 587 m3x106

Construction Dates

Start of Project: 10/92

Start of RCC: 10/92

End of RCC: 08/94

End of Project: 03/95

Specifications

Height: 40 metres

Length: 124 metres

Volume of RCC: 28 m3x103

Total volume: 35 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
85Low-lime flyash (ASTM Class F)
  
Lac Robertson completed
Lac Robertson completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Tuwushui

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/04

End of Project: -/04

Specifications

Height: 53 metres

Length: 124 metres

Volume of RCC: -

Total volume: 29 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates