Dam Search Results
- Length: 1790 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Grand Ethiopian Renaissance Dam Project (GERDP) | Ethiopia | H | Blue Nile | 74000 | 12/10 | 05/13 | - /22 | - /24 | 160 | 1790 | 10100 | 10500 | 0.22 | (3') | 1.00 | (3')* | 1.00 | (3')* | 400 | 400 | 67 to 105 | 23 to 35 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Ethiopia
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Blue Nile
Reservoir capacity: 74000 m3x106
Construction Dates
Start of Project: 12/10
Start of RCC: 12/10
End of RCC: -/22
End of Project: -/24
Specifications
Height: 160 metres
Length: 1790 metres
Volume of RCC: 10100 m3x103
Total volume: 10500 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.22 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
67 to |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
23 to | Natural pozzolan (ASTM Class N) |