Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Carroll E. Ecton - formerly Winchester | USA | W | Upper Howard Creek | 2 | 06/84 | 08/84 | 11/84 | 01/85 | 23 | 363 | 24 | 27 | V | (6) | V 1.00 | (5) (17) | 1.00 | (1) | 300 | 300 | 104 | 0 | (-) - |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Upper Howard Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/84
Start of RCC: 06/84
End of RCC: 11/84
End of Project: 01/85
Specifications
Height: 23 metres
Length: 363 metres
Volume of RCC: 24 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
1.00 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
104 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates