Dam Search Results
- River: Lancang (Mekong)
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Huangdeng | China | H I R | Lancang (Mekong) | 1613 | 01/10 | 04/15 | 04/18 | 06/19 | 203 | 464 | 2753 | 3670 | (3') | (3') | (12) | 300 | 300 | 82 67 | 100 100 | (F) | ||||
| Dahuaqiao | China | H | Lancang (Mekong) | 293 | - /10 | - /13 | - /18 | - /19 | 107 | 232 | 112 | |||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation
River: Lancang (Mekong)
Reservoir capacity: 1613 m3x106
Construction Dates
Start of Project: 01/10
Start of RCC: 01/10
End of RCC: 04/18
End of Project: 06/19
Specifications
Height: 203 metres
Length: 464 metres
Volume of RCC: 2753 m3x103
Total volume: 3670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
| RCC against formwork (GEVR/GE-RCC) | 
Downstream
| Slope | Type | 
|---|---|
| RCC against formwork (GEVR/GE-RCC) | 
Spillway
| Slope | Type | 
|---|---|
| Reinforced conventional concrete cast after RCC placement | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 82 | 
| 67 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 100 | Low-lime flyash (ASTM Class F) | 
| 100 | 

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/18
End of Project: -/19
Specifications
Height: 107 metres
Length: 232 metres
Volume of RCC: -
Total volume: 112 m3x103
Construction Methods
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates