Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Yukari (Upper) Kalekö | Turkey | H | Murat | 784 | 06/12 | 06/14 | 09/16 | 04/18 | 150 | 516 | 2224 | 2414 | 0.25 | (7) | 0.80 | (1) | 300 | 300 | 90 | 40 | (M) | |||
Asagi (Lower) Kaleköy | Turkey | H | Murat | 556 | 03/13 | - /15 | - /20 | 04/21 | 125 | 346 | 1192 | 1342 | 0.25 | (7) | 0.80 | (3) | separate | 300 | 300 | 90 | 40 | (M) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 784 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 09/16
End of Project: 04/18
Specifications
Height: 150 metres
Length: 516 metres
Volume of RCC: 2224 m3x103
Total volume: 2414 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.25 | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
40 | Milled sand |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 556 m3x106
Construction Dates
Start of Project: 03/13
Start of RCC: 03/13
End of RCC: -/20
End of Project: 04/21
Specifications
Height: 125 metres
Length: 346 metres
Volume of RCC: 1192 m3x103
Total volume: 1342 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.25 | RCC against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
40 | Milled sand |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates