Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Dahuashui [A] | China | H | Qingshui | 276 | 01/04 | 04/05 | 11/06 | - /07 | 135 | 198 | 550 | 670 | curve | (3') | curve | (3') | (1) | 300 | 3000 | 81 94 | 81 94 | (F) | ||
Geliqiao | China | H | Qingshui | 77 | 01/07 | 04/08 | - /09 | - /10 | 124 | 104 | 500 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Qingshui
Reservoir capacity: 276 m3x106
Construction Dates
Start of Project: 01/04
Start of RCC: 01/04
End of RCC: 11/06
End of Project: -/07
Specifications
Height: 135 metres
Length: 198 metres
Volume of RCC: 550 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
81 |
94 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
81 | Low-lime flyash (ASTM Class F) |
94 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Qingshui
Reservoir capacity: 77 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 124 metres
Length: 104 metres
Volume of RCC: -
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates