NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Tucuruí - 2nd PhaseBrazilHTocantins4580006/9806/9909/0010/057815412881383 (3) (3)*separate 3003007030(N)
Cana BravaBrazilHTocantins230003/9902/0010/0110/0267510527833 (1) (3)*ogee(1)3003004050(S)
Lajeado (Luis Eduardo Magalhães)BrazilHTocantins498207/9806/0112/0112/02432100188210      3003003040(S)
Peixe AngicalBrazilHTocantins304/02- /04- /0509/0639400500582      300300700(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 45800 m3x106

Construction Dates

Start of Project: 06/98

Start of RCC: 06/98

End of RCC: 09/00

End of Project: 10/05

Specifications

Height: 78 metres

Length: 1541 metres

Volume of RCC: 288 m3x103

Total volume: 1383 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Tucuruí - 2nd Phase completed
Tucuruí - 2nd Phase completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 2300 m3x106

Construction Dates

Start of Project: 03/99

Start of RCC: 03/99

End of RCC: 10/01

End of Project: 10/02

Specifications

Height: 67 metres

Length: 510 metres

Volume of RCC: 527 m3x103

Total volume: 833 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
40
Pozzolan (kg/m3)Pozzolan Type
50Ground-granulated blast-furnace slag
  
Cana Brava completed
Cana Brava completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 4982 m3x106

Construction Dates

Start of Project: 07/98

Start of RCC: 07/98

End of RCC: 12/01

End of Project: 12/02

Specifications

Height: 43 metres

Length: 2100 metres

Volume of RCC: 188 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
30
Pozzolan (kg/m3)Pozzolan Type
40Ground-granulated blast-furnace slag
  
Lajeado (Luis Eduardo Magalhães) completed
Lajeado (Luis Eduardo Magalhães) completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 04/02

Start of RCC: 04/02

End of RCC: -/05

End of Project: 09/06

Specifications

Height: 39 metres

Length: 400 metres

Volume of RCC: 500 m3x103

Total volume: 582 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Peixe Angical completed
Peixe Angical completed

 

Search again