Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Huanghuazhai
[A]
ChinaHGetu174807/06- /07- /08- /08110253280292        5296(F)
MetolongLesothoWSouth Phuthiatsana6409/1108/1311/1404/1583278280314 (3') (3') (3')30030060145(F)
GündüzlerTurkeyIDegirmen8- /16- /19- /23- /2465 280 V(1)0.75(1)  30030011337(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Getu

Reservoir capacity: 1748 m3x106

Construction Dates

Start of Project: 07/06

Start of RCC: 07/06

End of RCC: -/08

End of Project: -/08

Specifications

Height: 110 metres

Length: 253 metres

Volume of RCC: 280 m3x103

Total volume: 292 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
52
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Huanghuazhai completed
Huanghuazhai completed

Full Dam Information

Details

Country: Lesotho

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: South Phuthiatsana

Reservoir capacity: 64 m3x106

Construction Dates

Start of Project: 09/11

Start of RCC: 09/11

End of RCC: 11/14

End of Project: 04/15

Specifications

Height: 83 metres

Length: 278 metres

Volume of RCC: 280 m3x103

Total volume: 314 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
145Low-lime flyash (ASTM Class F)
  
Metolong completed
Metolong completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Degirmen

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 65 metres

Length: -

Volume of RCC: 280 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
113
Pozzolan (kg/m3)Pozzolan Type
37Low-lime flyash (ASTM Class F)
  
Gündüzler under construction
Gündüzler under construction

 