Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Köprü | Turkey | H | Göksu | 98 | 07/09 | 12/10 | 04/12 | - /13 | 109 | 413 | 975 | 1050 | V 0.60 | (1) (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 85 | 45 | (F) | |
Tabellout [A-G] | Algeria | I W | Djen Djen | 294 | 03/10 | 03/13 | 08/15 | 12/15 | 121 | 366 | 975 | (12) | (12) | (12)* | 300 | 300 | 85 | 45 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: 07/09
Start of RCC: 07/09
End of RCC: 04/12
End of Project: -/13
Specifications
Height: 109 metres
Length: 413 metres
Volume of RCC: 975 m3x103
Total volume: 1050 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | Low-lime flyash (ASTM Class F) |
Details
Country: Algeria
Owner: -
Type: Arch-Gravity
Purpose(s): Irrigation / Water Supply
River: Djen Djen
Reservoir capacity: 294 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: 08/15
End of Project: 12/15
Specifications
Height: 121 metres
Length: 366 metres
Volume of RCC: 975 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | |