Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
JinjiangChinaF HJinjianghe18907/9010/9103/9307/9368229182267V(1)0.75(1)0.65(1)
(1)
30030007080(F)
Shannipo
[A]
ChinaHBeipan85- /09- /11- /13- /15119205199267curve(3')curve(3)ogee(3)     

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Jinjianghe

Reservoir capacity: 189 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 03/93

End of Project: 07/93

Specifications

Height: 68 metres

Length: 229 metres

Volume of RCC: 182 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.65Traditional concrete against formwork
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
80Low-lime flyash (ASTM Class F)
  
Jinjiang completed
Jinjiang completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/13

End of Project: -/15

Specifications

Height: 119 metres

Length: 205 metres

Volume of RCC: 199 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shannipo completed
Shannipo completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates