Dam Search Results
- Total Volume: 45 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Jim Wilson (formerly Town Wash Detention) | USA | F | Town Wash | 01/92 | 03/92 | 05/92 | 06/92 | 18 | 264 | 43 | 45 | V | (14) | 1.50 | (3) | 1.50 | (3)* (17)* | 200 | 200 | 107 | 71 | (F) | ||
| Maojiang [A] | China | H I | Xiang | 2 | - /92 | - /93 | - /94 | - /95 | 45 | 150 | 45 | (F) | ||||||||||||
| Deep Creek Nº5D | USA | F W | Deep Creek | 15 | 12/08 | 04/09 | 12/09 | 07/10 | 22 | 226 | 39 | 45 | V | (3') | 0.80 | (3')* | 0.80 | (1)* | 300 | 300 | 89 | 89 | (F) | |
| Hatta Upper Saddle | UAE | H | 12/19 | 03/21 | 09/21 | - /24 | 38 | 184 | 41 | 45 | (7) | (7) | (7)* | 300 | 300 | 65 | 120 | (F) | ||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Town Wash
Reservoir capacity: -
Construction Dates
Start of Project: 01/92
Start of RCC: 01/92
End of RCC: 05/92
End of Project: 06/92
Specifications
Height: 18 metres
Length: 264 metres
Volume of RCC: 43 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 1.50 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 1.50 | RCC against formwork [stepped face] |
| Unformed face of RCC [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 71 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Xiang
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 45 metres
Length: 150 metres
Volume of RCC: -
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Deep Creek
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: 12/09
End of Project: 07/10
Specifications
Height: 22 metres
Length: 226 metres
Volume of RCC: 39 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: UAE
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 12/19
Start of RCC: 12/19
End of RCC: 09/21
End of Project: -/24
Specifications
Height: 38 metres
Length: 184 metres
Volume of RCC: 41 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| RCC against precast concrete panels [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
