Dam Search Results
- Owner: Ministry of Agriculture
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Marathia [H-F] | Greece | Ministry of Agriculture | I W | Marathia | 3 | 11/91 | 12/92 | 04/93 | 06/93 | 28 | 265 | 31 | 48 | 0.50 | (13) | 0.50 | (10) | 0.50 | (13) | 200 - 300 | 200 - 300 | 55 | 15 | (N) |
Ano Mera [H-F] | Greece | Ministry of Agriculture | I W | Ano Mera | 1 | 04/93 | 03/95 | - /95 | - /97 | 32 | 170 | 49 | 64 | 0.50 | (13) | 0.50 | (10) | 0.50 | (1) | 200 - 300 | 200 - 300 | 55 | 15 | (N) |
Shinmiyagawa | Japan | Ministry of Agriculture | I | Miya | 10 | 03/94 | 07/97 | 08/00 | 03/03 | 69 | 325 | 393 | 480 | V | (1) | 0.83 | (1) | 0.83 | (1) | 250 | 750 | 91 | 39 | (F) |
Steno [H-F] | Greece | Ministry of Agriculture | I W | Steno | 1 | 02/00 | 07/01 | 10/02 | 06/03 | 32 | 170 | 69 | 70 | 0.70 | (13) | 0.70 | (10) | 0.70 | (1) | 200 - 300 | 200 - 300 | 55 | 5 | (N) |
Koris Gefiri (Maiden’s bridge) [H-F] | Greece | Ministry of Agriculture | I W | Partheni | 3 | 11/05 | 03/07 | 07/10 | - /16 | 42 | 221 | 170 | 190 | 0.80 | (13) | 0.80 | (3) | 0.80 | (1)* | 300 - 450 | 300 - 450 | 50 | 10 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Marathia
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/91
Start of RCC: 11/91
End of RCC: 04/93
End of Project: 06/93
Specifications
Height: 28 metres
Length: 265 metres
Volume of RCC: 31 m3x103
Total volume: 48 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
0.50 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
200 - | 200 - |
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Ano Mera
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/93
Start of RCC: 04/93
End of RCC: -/95
End of Project: -/97
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 49 m3x103
Total volume: 64 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
0.50 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
200 - | 200 - |
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Ministry of Agriculture
Type: Gravity
Purpose(s): Irrigation
River: Miya
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 03/94
Start of RCC: 03/94
End of RCC: 08/00
End of Project: 03/03
Specifications
Height: 69 metres
Length: 325 metres
Volume of RCC: 393 m3x103
Total volume: 480 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.83 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.83 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Steno
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 02/00
Start of RCC: 02/00
End of RCC: 10/02
End of Project: 06/03
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 69 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
0.70 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
200 - | 200 - |
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
5 | Natural pozzolan (ASTM Class N) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Partheni
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 07/10
End of Project: -/16
Specifications
Height: 42 metres
Length: 221 metres
Volume of RCC: 170 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
450 | 450 |
Cementitious material
Cement (kg/m3) |
---|
50 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
10 | Natural pozzolan (ASTM Class N) |

Search again
Please note: only dams with known co-ordinates will appear on this map.