StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Middle ForkUSAF WMiddle Fork 105/8407/8409/8411/84381254243V(1)0.80(1)*conduit 300300660(-) -
Castilblanco de los ArroyosSpainWCala107/8405/8510/8512/85251241420V(1)V
0.75
(1)
(1)
0.75(1)45045072
61
116
120
(F)
La ManzanillaMexicoFIbarrilla111/8601/8705/8707/87361502030V
0.15
(5)
(5)
V
0.80
(5)
(17)
0.80(12)300300135135(F)
Lower Chase CreekUSAFLower Chase Creek103/8705/8706/8707/87271221422V(1)0.70(1)*0.70(1)*3003006440(F)
Ain al KoreimaMoroccoIAkreuch106/8709/8702/8803/882612417200.20(5)*0.20
0.75
(5)
(17)
0.60(1)*35035070
140
30
60
(S)
Yuxi
[A]
ChinaWYuxi1- /85- /87- /88- /8938102            (F)
Wright’s Retarding BasinAustraliaFPoint Hut Creek101/8906/8908/8910/89188699V(7)1.00(16)1.00(13)30030014573(F)
RiouFranceH I RRiou101/9006/9007/9003/91263084146V(2)0.60(14)*0.60(14)*300300 120(R)
HervásSpainWHervás101/8903/9009/9010/903321024430.15(1)0.70(1)*
(5)*
0.70(1)30030080155(F)
Belén-CagüelaSpainFBelén103/9106/9110/9110/913116024290.05(3)0.75(3)*0.75(3)*30030073109(F)
CholdocogagnaFranceWLessarte104/9107/9110/9112/913610019230.10(1)0.75(16)0.75(1)*300300 110(R)
Belén-GatoSpainFBelén107/9109/9111/9111/913415836410.05(3)0.75(3)*0.75(3)*30030073109(F)
Caballar ISpainFBelén109/9109/9112/9112/911698670.05(3)0.75(3)*0.75(3)*30030073109(F)
Amatisteros IIISpainFBelén1- /9109/9112/91- /92157545V(3)0.75(3)0.75(3)30030073109(F)
Belén-FloresSpainFBelén109/9111/9101/9201/92288710120.05(3)0.75(3)*0.75(3)*30030073109(F)
PaxtonSouth AfricaITsorwo1- /9001/9112/92- /92177033V(3)V
0.50
(3)0.50(3)15015070100(F)
Lower Molonglo Bypass StorageAustraliaPUnnamed creek102/9406/9408/9411/94321202227V(1)0.80(1)*0.80(1)*3003009664(F)
Kengxiashan
[A]
ChinaHYuquanxi1- /96- /97- /98- /983480             
Bullard CreekUSAFBullard Creek110/9808/99- /99- /991611077V(3)v
0.75
(3)*0.75(3)*30030014844(F)
Trout CreekUSAI RTrout Creek108/9904/0005/0007/003138910V(1)0.80(1)*0.80(1)*3003001630(-) -
Pickle JarUSAW 110/9903/0005/0008/001657331331V(1)0.80(1)*0.80(1)*300300900(-) -
SafadUAEG I 1- /0005/0106/01- /0119100910V(1)0.80(1)*0.80(12)300300900(-) -
ShowkahUAEG I 1- /0008/0110/01- /012410518200.10(11)0.80(1)*0.80(12)300300900(-) -
Nankengyuan
[A]
ChinaHXiaoxihe1- /98- /00- /02- /0334114             
Huilong PSS - Upper damChinaH 106/0111/0211/03- /05542087376V(3')0.75(3')none 300300  (F)
Shanggou
[A]
ChinaWYangshui1- /01- /02- /03- /0439176             
Pine BrookUSAW 101/0510/0504/06- /06261702730V(7) (17)separate 3003009559(F)
Genesee #2USAWBear Creek106/0611/0611/0610/072916824 V     300300   
EsmeraldaBrazilH 1- /05- /05- /06- /0619 1527        6416(N)
Hickory Log CreekUSAWHickory Log Creek110/0512/0606/0710/0755290165 V(8)0.80(3')*0.80(1)30030089
80  74
89
98  104
(F)
North ParaAustraliaFNorth Para111/0606/0709/07- /07332065050V(3') (3')* (3')*30030060160(F)
TiechengChinaHDatong1- /05- /06- /07- /0844143             
Plano AltoBrazilH 1- /06- /07- /0702/08381734278V 0.75 0.75   7219(N)
El HandakMoroccoIEl Handak1- /05- /06- /08- /0927              
Sidi el MahjoubMoroccoIfrane1- /06- /07- /08- /0922 1518V(5)1.00(1)*1.00(1)*     
XiaotianlongChinaWTuochang1- /07- /08- /09- /0958168 125           
Barra do CoqueirosBrazilH WClaro108/07- /08- /0907/10601670172282           
WyaralongAustraliaWTeviot Brook109/0904/1012/1006/1148464173  (1) (1) (1)3003008585(F)
IbiramaBrazilH 1- /09- /09- /10- /1015145             
Ninho da ÁguiaBrazilHSanto Antônio1- /09- /09- /10- /101594 14V 0.75 0.75      
Thornton Gap (Tollway)USAF-102/1006/1109/1111/1135692525V(3') (3')* (3')*3003004879(F)
MoínhoBrazilHBernado Jose1- /09- /10- /11- /1122 925        6817(N)
LaananatMoroccoW 1- /09- /10- /11- /1215 18200.20(5)0.80(1)*0.80(1)*     
RizzaneseFranceH IRizzanese1- /0904/1102/12- /12411406472V
1.00
(6)
(10)
V
0.80
 0.80 300300800(-) -
TongzilinChinaHYalongjiang1- /08- /10- /12- /1471              
TamelastMorocco 1- /11- /12- /13- /1419 27 V(5)1.00(1)*1.00(1)*     
BonyicPanamaHBonyic1- /11- /1308/14- /1537165 88           
MamakTurkeyFBağ1- /13- /13- /14- /143111830            
Teles PiresBrazilHTeles Pires107/11- /13- /1509/16673605001020           
Sariveliler GöktepeTurkeyIGelenalan1- /13- /14- /15- /153933069         600(-) -
Bergama ÇamavluTurkeyIHasanderesi1- /14- /14- /15- /154024169 0.10(1)0.80(1)  3003008535(F)
Güdül KırkkavakTurkeyI WOrmanlik1- /14- /15- /1610/1749265114            
Nazilli İsabeyliTurkeyIİsabeyli Deresi1- /14- /15- /16- /174214870            
Oltu SivridereTurkeyILimontozu1- /14- /15- /16- /174663269            
Dyraaba (part of Uma Oya Project)Sri LankaH IMathatilla Oya1- /11- /13- /17- /18501654050V(1) (1) (12)3003009595(F)
ÜniversiteTurkeyWÇırçıp1- /15- /16- /17- /173611020            
Çamoluk AlısızTurkeyIAlısızın Deresi1- /16- /16- /17- /18238314 V 0.70 0.70      
Puhulpola (part of Uma Oya Project)Sri LankaH IDalgolia Oya1- /11- /13- /18- /19351743040V(1) (1) (12)3003009595(F)
Tasköprü ÇayTurkeyI WUludere103/1707/1809/1908/205212255 0.10(1)0.80(1)  300 7550 
Sharab GarodIranISharab Garod1- /12- /14- /20- /221575 12           
BouhdidAlgeriaFOued Bouhdid1- /18- /19- /20- /2130260 600.10 0.90        
DavarlıTurkeyIKara Creek1- /16- /19- /21- /233911934            
Gürün ÇamlıcaTurkeyIKırkgöz Creek1- /17- /19- /21- /232814228 0.10 0.80   300 8032 
Ulus EldeşTurkeyI WKarakuz Creek1- /16- /20- /22- /234612538 V
0.10
(1)
(1)
0.80(1)  300 8368(F)
ÇalıcaalanTurkeyIGök Creek1- /15- /20- /22- /243319550            
UluhanTurkeyIGök Creek1- /17- /20- /22- /243122830            
Akçali-2TurkeyISagin1- /16- /19- /23- /2440148 720.10(1)0.70(1)*0.70(12)3003009060(F)
UzundereTurkeyIUzun Creek1- /16- /20- /23- /24425935            
Akçakoca AltunçayTurkeyIKilsuyu Creek1- /18- /20- /23- /243395             
ÜzengiliTurkeyIBüyük Creek1- /18- /21- /23- /245015794 0.10(1)0.80(1)       
Ula ÇıtlıkTurkeyIBüyükdere1- /17- /22- /24- /262912530            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Middle Fork

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 05/84

Start of RCC: 05/84

End of RCC: 09/84

End of Project: 11/84

Specifications

Height: 38 metres

Length: 125 metres

Volume of RCC: 42 m3x103

Total volume: 43 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
66
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Middle Fork completed
Middle Fork completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Cala

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 07/84

Start of RCC: 07/84

End of RCC: 10/85

End of Project: 12/85

Specifications

Height: 25 metres

Length: 124 metres

Volume of RCC: 14 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
450450

Cementitious material

Cement (kg/m3)
72
61
Pozzolan (kg/m3)Pozzolan Type
116Low-lime flyash (ASTM Class F)
120 
Castilblanco de los Arroyos completed
Castilblanco de los Arroyos completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Ibarrilla

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 11/86

Start of RCC: 11/86

End of RCC: 05/87

End of Project: 07/87

Specifications

Height: 36 metres

Length: 150 metres

Volume of RCC: 20 m3x103

Total volume: 30 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.15Traditional concrete against precast concrete panels
Downstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.80Unformed face of RCC
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
135
Pozzolan (kg/m3)Pozzolan Type
135Low-lime flyash (ASTM Class F)
  
La Manzanilla completed
La Manzanilla completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Lower Chase Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/87

Start of RCC: 03/87

End of RCC: 06/87

End of Project: 07/87

Specifications

Height: 27 metres

Length: 122 metres

Volume of RCC: 14 m3x103

Total volume: 22 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
40Low-lime flyash (ASTM Class F)
  
Lower Chase Creek completed
Lower Chase Creek completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Akreuch

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/87

Start of RCC: 06/87

End of RCC: 02/88

End of Project: 03/88

Specifications

Height: 26 metres

Length: 124 metres

Volume of RCC: 17 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels  [stepped face]
Downstream
SlopeType
0.20Traditional concrete against precast concrete panels
0.75Unformed face of RCC
Spillway
SlopeType
0.60Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
350350

Cementitious material

Cement (kg/m3)
70
140
Pozzolan (kg/m3)Pozzolan Type
30Ground-granulated blast-furnace slag
60 
Ain al Koreima completed
Ain al Koreima completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Water Supply

River: Yuxi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/85

Start of RCC: -/85

End of RCC: -/88

End of Project: -/89

Specifications

Height: 38 metres

Length: 102 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Australia

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Point Hut Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 01/89

Start of RCC: 01/89

End of RCC: 08/89

End of Project: 10/89

Specifications

Height: 18 metres

Length: 86 metres

Volume of RCC: 9 m3x103

Total volume: 9 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
1.00Mechanically compacted unformed face of RCC
Spillway
SlopeType
1.00Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
145
Pozzolan (kg/m3)Pozzolan Type
73Low-lime flyash (ASTM Class F)
  
Wright’s Retarding Basin completed
Wright’s Retarding Basin completed

Full Dam Information

Details

Country: France

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Recreation

River: Riou

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 01/90

Start of RCC: 01/90

End of RCC: 07/90

End of Project: 03/91

Specifications

Height: 26 metres

Length: 308 metres

Volume of RCC: 41 m3x103

Total volume: 46 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.60Slip-formed/extruded facing elements  [stepped face]
Spillway
SlopeType
0.60Slip-formed/extruded facing elements  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
120ROLAC (mixture of flyash and slag with or without limestone fines)
  
Riou completed
Riou completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Hervás

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 01/89

Start of RCC: 01/89

End of RCC: 09/90

End of Project: 10/90

Specifications

Height: 33 metres

Length: 210 metres

Volume of RCC: 24 m3x103

Total volume: 43 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
 Traditional concrete against precast concrete panels  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
155Low-lime flyash (ASTM Class F)
  
Hervás completed
Hervás completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Belén

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/91

Start of RCC: 03/91

End of RCC: 10/91

End of Project: 10/91

Specifications

Height: 31 metres

Length: 160 metres

Volume of RCC: 24 m3x103

Total volume: 29 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
  
Belén-Cagüela completed
Belén-Cagüela completed

Full Dam Information

Details

Country: France

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Lessarte

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 04/91

Start of RCC: 04/91

End of RCC: 10/91

End of Project: 12/91

Specifications

Height: 36 metres

Length: 100 metres

Volume of RCC: 19 m3x103

Total volume: 23 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.75Mechanically compacted unformed face of RCC
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
110ROLAC (mixture of flyash and slag with or without limestone fines)
  
Choldocogagna completed
Choldocogagna completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Belén

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 07/91

Start of RCC: 07/91

End of RCC: 11/91

End of Project: 11/91

Specifications

Height: 34 metres

Length: 158 metres

Volume of RCC: 36 m3x103

Total volume: 41 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
  
Belén-Gato completed
Belén-Gato completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Belén

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 09/91

Start of RCC: 09/91

End of RCC: 12/91

End of Project: 12/91

Specifications

Height: 16 metres

Length: 98 metres

Volume of RCC: 6 m3x103

Total volume: 7 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
  
Caballar I completed
Caballar I completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Belén

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/91

Start of RCC: -/91

End of RCC: 12/91

End of Project: -/92

Specifications

Height: 15 metres

Length: 75 metres

Volume of RCC: 4 m3x103

Total volume: 5 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
0.75RCC against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
  
Amatisteros III completed
Amatisteros III completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Belén

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 09/91

Start of RCC: 09/91

End of RCC: 01/92

End of Project: 01/92

Specifications

Height: 28 metres

Length: 87 metres

Volume of RCC: 10 m3x103

Total volume: 12 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
  
Belén-Flores completed
Belén-Flores completed

Full Dam Information

Details

Country: South Africa

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Tsorwo

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/90

Start of RCC: -/90

End of RCC: 12/92

End of Project: -/92

Specifications

Height: 17 metres

Length: 70 metres

Volume of RCC: 3 m3x103

Total volume: 3 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
VerticalRCC against formwork
0.50 
Spillway
SlopeType
0.50RCC against formwork

Placement

Layers (mm)Lifts (mm)
150150

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Australia

Owner: -

Type: Gravity

Purpose(s): Pollution Control

River: Unnamed creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 02/94

Start of RCC: 02/94

End of RCC: 08/94

End of Project: 11/94

Specifications

Height: 32 metres

Length: 120 metres

Volume of RCC: 22 m3x103

Total volume: 27 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
96
Pozzolan (kg/m3)Pozzolan Type
64Low-lime flyash (ASTM Class F)
  
Lower Molonglo Bypass Storage completed
Lower Molonglo Bypass Storage completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Yuquanxi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/98

End of Project: -/98

Specifications

Height: 34 metres

Length: 80 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Bullard Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 10/98

Start of RCC: 10/98

End of RCC: -/99

End of Project: -/99

Specifications

Height: 16 metres

Length: 110 metres

Volume of RCC: 7 m3x103

Total volume: 7 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
vRCC against formwork  [stepped face]
0.75 
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
148
Pozzolan (kg/m3)Pozzolan Type
44Low-lime flyash (ASTM Class F)
  
Bullard Creek completed
Bullard Creek completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Irrigation / Recreation

River: Trout Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 08/99

Start of RCC: 08/99

End of RCC: 05/00

End of Project: 07/00

Specifications

Height: 31 metres

Length: 38 metres

Volume of RCC: 9 m3x103

Total volume: 10 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
163
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Trout Creek completed
Trout Creek completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 10/99

Start of RCC: 10/99

End of RCC: 05/00

End of Project: 08/00

Specifications

Height: 16 metres

Length: 57 metres

Volume of RCC: 331 m3x103

Total volume: 331 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Pickle Jar completed
Pickle Jar completed

Full Dam Information

Details

Country: UAE

Owner: -

Type: Gravity

Purpose(s): Groundwater Recharge / Irrigation

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: 06/01

End of Project: -/01

Specifications

Height: 19 metres

Length: 100 metres

Volume of RCC: 9 m3x103

Total volume: 10 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Safad completed
Safad completed

Full Dam Information

Details

Country: UAE

Owner: -

Type: Gravity

Purpose(s): Groundwater Recharge / Irrigation

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: 10/01

End of Project: -/01

Specifications

Height: 24 metres

Length: 105 metres

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Reinforced conventional concrete cast before RCC placement
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Showkah completed
Showkah completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/02

End of Project: -/03

Specifications

Height: 34 metres

Length: 114 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 11/03

End of Project: -/05

Specifications

Height: 54 metres

Length: 208 metres

Volume of RCC: 73 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Huilong PSS - Upper dam completed
Huilong PSS - Upper dam completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Water Supply

River: Yangshui

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/03

End of Project: -/04

Specifications

Height: 39 metres

Length: 176 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 01/05

Start of RCC: 01/05

End of RCC: 04/06

End of Project: -/06

Specifications

Height: 26 metres

Length: 170 metres

Volume of RCC: 27 m3x103

Total volume: 30 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
 Unformed face of RCC
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
59Low-lime flyash (ASTM Class F)
  
Pine Brook completed
Pine Brook completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Bear Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/06

Start of RCC: 06/06

End of RCC: 11/06

End of Project: 10/07

Specifications

Height: 29 metres

Length: 168 metres

Volume of RCC: 24 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Genesee #2 completed
Genesee #2 completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/06

End of Project: -/06

Specifications

Height: 19 metres

Length: -

Volume of RCC: 15 m3x103

Total volume: 27 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)
  
Esmeralda under construction
Esmeralda under construction

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Hickory Log Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 10/05

Start of RCC: 10/05

End of RCC: 06/07

End of Project: 10/07

Specifications

Height: 55 metres

Length: 290 metres

Volume of RCC: 165 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
89
80  74
Pozzolan (kg/m3)Pozzolan Type
89Low-lime flyash (ASTM Class F)
98  104 
Hickory Log Creek completed
Hickory Log Creek completed

Full Dam Information

Details

Country: Australia

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: North Para

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 11/06

Start of RCC: 11/06

End of RCC: 09/07

End of Project: -/07

Specifications

Height: 33 metres

Length: 206 metres

Volume of RCC: 50 m3x103

Total volume: 50 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
North Para completed
North Para completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Datong

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 44 metres

Length: 143 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: 02/08

Specifications

Height: 38 metres

Length: 173 metres

Volume of RCC: 42 m3x103

Total volume: 78 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
19Natural pozzolan (ASTM Class N)
  
Plano Alto on Google Earth
Plano Alto on Google Earth

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: El Handak

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/08

End of Project: -/09

Specifications

Height: 27 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
El Handak on Google Earth
El Handak on Google Earth

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): unknown

River: Ifrane

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 22 metres

Length: -

Volume of RCC: 15 m3x103

Total volume: 18 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
1.00Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sidi el Mahjoub completed
Sidi el Mahjoub completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Tuochang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/09

Specifications

Height: 58 metres

Length: 168 metres

Volume of RCC: -

Total volume: 125 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaotianlong completed
Xiaotianlong completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Claro

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/09

End of Project: 07/10

Specifications

Height: 60 metres

Length: 1670 metres

Volume of RCC: 172 m3x103

Total volume: 282 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Barra do Coqueiros on Google Earth
Barra do Coqueiros on Google Earth

Full Dam Information

Details

Country: Australia

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Teviot Brook

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 09/09

Start of RCC: 09/09

End of RCC: 12/10

End of Project: 06/11

Specifications

Height: 48 metres

Length: 464 metres

Volume of RCC: 173 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
85Low-lime flyash (ASTM Class F)
  
Wyaralong completed
Wyaralong completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: -/10

Specifications

Height: 15 metres

Length: 145 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ibirama on Google Earth
Ibirama on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Santo Antônio

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: -/10

Specifications

Height: 15 metres

Length: 94 metres

Volume of RCC: -

Total volume: 14 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ninho da Águia completed
Ninho da Águia completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 02/10

Start of RCC: 02/10

End of RCC: 09/11

End of Project: 11/11

Specifications

Height: 35 metres

Length: 69 metres

Volume of RCC: 25 m3x103

Total volume: 25 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
48
Pozzolan (kg/m3)Pozzolan Type
79Low-lime flyash (ASTM Class F)
  
Thornton Gap (Tollway) completed
Thornton Gap (Tollway) completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bernado Jose

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 22 metres

Length: -

Volume of RCC: 9 m3x103

Total volume: 25 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)
  
Moínho completed
Moínho completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 15 metres

Length: -

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: France

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Rizzanese

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: 02/12

End of Project: -/12

Specifications

Height: 41 metres

Length: 140 metres

Volume of RCC: 64 m3x103

Total volume: 72 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
1.00RCC against precast concrete blocks
Downstream
SlopeType
Vertical 
0.80 
Spillway
SlopeType
0.80 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Rizzanese completed
Rizzanese completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Yalongjiang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/12

End of Project: -/14

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tongzilin completed
Tongzilin completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): unknown

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 19 metres

Length: -

Volume of RCC: 27 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
1.00Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tamelast under construction
Tamelast under construction

Full Dam Information

Details

Country: Panama

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bonyic

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 08/14

End of Project: -/15

Specifications

Height: 37 metres

Length: 165 metres

Volume of RCC: -

Total volume: 88 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bonyic completed
Bonyic completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Bağ

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/14

End of Project: -/14

Specifications

Height: 31 metres

Length: 118 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mamak completed
Mamak completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Teles Pires

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 07/11

Start of RCC: 07/11

End of RCC: -/15

End of Project: 09/16

Specifications

Height: 67 metres

Length: 360 metres

Volume of RCC: 500 m3x103

Total volume: 1020 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Teles Pires completed
Teles Pires completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gelenalan

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/15

Specifications

Height: 39 metres

Length: 330 metres

Volume of RCC: 69 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Sariveliler Göktepe completed
Sariveliler Göktepe completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Hasanderesi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/15

End of Project: -/15

Specifications

Height: 40 metres

Length: 241 metres

Volume of RCC: 69 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
35Low-lime flyash (ASTM Class F)
  
Bergama Çamavlu completed
Bergama Çamavlu completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Ormanlik

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: 10/17

Specifications

Height: 49 metres

Length: 265 metres

Volume of RCC: 114 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Güdül Kırkkavak completed
Güdül Kırkkavak completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: İsabeyli Deresi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 42 metres

Length: 148 metres

Volume of RCC: 70 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nazilli İsabeyli completed
Nazilli İsabeyli completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Limontozu

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 46 metres

Length: 63 metres

Volume of RCC: 269 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Oltu Sivridere completed
Oltu Sivridere completed

Full Dam Information

Details

Country: Sri Lanka

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Mathatilla Oya

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/17

End of Project: -/18

Specifications

Height: 50 metres

Length: 165 metres

Volume of RCC: 40 m3x103

Total volume: 50 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Dyraaba (part of Uma Oya Project) completed
Dyraaba (part of Uma Oya Project) completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Çırçıp

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/17

Specifications

Height: 36 metres

Length: 110 metres

Volume of RCC: 20 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Üniversite completed
Üniversite completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Alısızın Deresi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/17

End of Project: -/18

Specifications

Height: 23 metres

Length: 83 metres

Volume of RCC: 14 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.70 
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Çamoluk Alısız completed
Çamoluk Alısız completed

Full Dam Information

Details

Country: Sri Lanka

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Dalgolia Oya

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/18

End of Project: -/19

Specifications

Height: 35 metres

Length: 174 metres

Volume of RCC: 30 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Puhulpola (part of Uma Oya Project) completed
Puhulpola (part of Uma Oya Project) completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Uludere

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/17

Start of RCC: 03/17

End of RCC: 09/19

End of Project: 08/20

Specifications

Height: 52 metres

Length: 122 metres

Volume of RCC: 55 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50 
  
Tasköprü Çay completed
Tasköprü Çay completed

Full Dam Information

Details

Country: Iran

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Sharab Garod

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/20

End of Project: -/22

Specifications

Height: 15 metres

Length: 75 metres

Volume of RCC: -

Total volume: 12 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sharab Garod on Google Earth
Sharab Garod on Google Earth

Full Dam Information

Details

Country: Algeria

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Oued Bouhdid

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/20

End of Project: -/21

Specifications

Height: 30 metres

Length: 260 metres

Volume of RCC: -

Total volume: 60 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.90 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Kara Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/23

Specifications

Height: 39 metres

Length: 119 metres

Volume of RCC: 34 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Davarlı under construction
Davarlı under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Kırkgöz Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/21

End of Project: -/23

Specifications

Height: 28 metres

Length: 142 metres

Volume of RCC: 28 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.80 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
32 
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Karakuz Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/22

End of Project: -/23

Specifications

Height: 46 metres

Length: 125 metres

Volume of RCC: 38 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
83
Pozzolan (kg/m3)Pozzolan Type
68Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gök Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/24

Specifications

Height: 33 metres

Length: 195 metres

Volume of RCC: 50 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gök Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/24

Specifications

Height: 31 metres

Length: 228 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Sagin

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 40 metres

Length: 148 metres

Volume of RCC: -

Total volume: 72 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
  
Akçali-2 under construction
Akçali-2 under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Uzun Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/23

End of Project: -/24

Specifications

Height: 42 metres

Length: 59 metres

Volume of RCC: 35 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Kilsuyu Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 33 metres

Length: 95 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Büyük Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 50 metres

Length: 157 metres

Volume of RCC: 94 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Büyükdere

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/24

End of Project: -/26

Specifications

Height: 29 metres

Length: 125 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  