SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Jin’anqiaoChinaH N RJinsha91312/0305/07- /10- /1116064024004430V(3)0.75(3)0.75(1)  72
96
108
117
(F)
Grand Ethiopian Renaissance Dam Project (GERDP)EthiopiaHBlue Nile7400012/1005/13- /22- /24160179010100105000.22(3')1.00(3')*1.00(3')*40040067 to  10523 to  35(N)
El-Janneh
[A-G]
LebanonH I WIbrahim (Abraham)38- /1502/20- /22- /221603501450       300300   
Middle YeywaMyanmarHMyitnge45317/00- /19- /23- /251602441700            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Navigation / Recreation

River: Jinsha

Reservoir capacity: 913 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: -/10

End of Project: -/11

Specifications

Height: 160 metres

Length: 640 metres

Volume of RCC: 2400 m3x103

Total volume: 4430 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
96
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
117 
Jin’anqiao completed
Jin’anqiao completed

Full Dam Information

Details

Country: Ethiopia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Blue Nile

Reservoir capacity: 74000 m3x106

Construction Dates

Start of Project: 12/10

Start of RCC: 12/10

End of RCC: -/22

End of Project: -/24

Specifications

Height: 160 metres

Length: 1790 metres

Volume of RCC: 10100 m3x103

Total volume: 10500 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.22RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
67  to
Pozzolan (kg/m3)Pozzolan Type
23  toNatural pozzolan (ASTM Class N)
  
Grand Ethiopian Renaissance Dam Project (GERDP) completed
Grand Ethiopian Renaissance Dam Project (GERDP) completed

Full Dam Information

Details

Country: Lebanon

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Ibrahim (Abraham)

Reservoir capacity: 38 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/22

Specifications

Height: 160 metres

Length: 350 metres

Volume of RCC: 1450 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
El-Janneh on Google Earth
El-Janneh on Google Earth

Full Dam Information

Details

Country: Myanmar

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Myitnge

Reservoir capacity: 453 m3x106

Construction Dates

Start of Project: 17/00

Start of RCC: 17/00

End of RCC: -/23

End of Project: -/25

Specifications

Height: 160 metres

Length: 244 metres

Volume of RCC: 1700 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates