SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
BailongtanChinaH I NHongshuihe34002/9310/9504/9608/97347106280V(1)0.70(10)*0.70(5)*30030073
99
110
60
(F)
Tie HackUSAWSouth Fork Clear Creek305/9610/9608/97- /97411706269V(1)0.80(1)*0.80(1)*3003008983(F)
El EsparragalSpainEViar5- /0205/0308/0303/042138362890.30(3')*0.90(3')*0.90(3')*30030068157(F)
Dry Comal CreekUSAFDry Comal Creek410/1103/1208/1212/12264576267V()0.80()*0.80()30030060100(C)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Hongshuihe

Reservoir capacity: 340 m3x106

Construction Dates

Start of Project: 02/93

Start of RCC: 02/93

End of RCC: 04/96

End of Project: 08/97

Specifications

Height: 34 metres

Length: 710 metres

Volume of RCC: 62 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70RCC against precast concrete blocks  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against precast concrete panels  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
99
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
60 
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: South Fork Clear Creek

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 05/96

Start of RCC: 05/96

End of RCC: 08/97

End of Project: -/97

Specifications

Height: 41 metres

Length: 170 metres

Volume of RCC: 62 m3x103

Total volume: 69 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
89
Pozzolan (kg/m3)Pozzolan Type
83Low-lime flyash (ASTM Class F)
  
Tie Hack completed
Tie Hack completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Environmental

River: Viar

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: 08/03

End of Project: 03/04

Specifications

Height: 21 metres

Length: 383 metres

Volume of RCC: 62 m3x103

Total volume: 89 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.90RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.90RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
157Low-lime flyash (ASTM Class F)
  
El Esparragal completed
El Esparragal completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Dry Comal Creek

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: 10/11

Start of RCC: 10/11

End of RCC: 08/12

End of Project: 12/12

Specifications

Height: 26 metres

Length: 457 metres

Volume of RCC: 62 m3x103

Total volume: 67 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical
Downstream
SlopeType
0.80  [stepped face]
Spillway
SlopeType
0.80

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
100High-lime flyash (ASTM Class C)
  
Dry Comal Creek completed
Dry Comal Creek completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates