Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
KazunogawaJapanHTuchimuro1211/9208/9507/9711/99105264428622V
0.10
(1)
(1)
0.82(1)0.82(1)170100091
84
39
36
(F)
Bailianya
[A]
ChinaF H I WDongpi480- /05- /06- /0704/09105422485600V(1)0.335(1)0.335(1)300300072
56
108
84
(F)
Changuinola 1
[A-G]
PanamaHChanguinola34704/0712/0904/1110/11105595884910V(3')0.50
0.70
(3')*
(3')*
0.50(12)30030070
65
145
150
(F)
GongguoqiaoChinaHLancang316- /08- /09- /1103/12105356 1067           
WacunChinaYou536- /08- /10- /13- /15105365             
IvirizuBoliviaHIvirizu - /18- /20- /22- /23105              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tuchimuro

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 07/97

End of Project: 11/99

Specifications

Height: 105 metres

Length: 264 metres

Volume of RCC: 428 m3x103

Total volume: 622 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.82Traditional concrete against formwork
Spillway
SlopeType
0.82Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
1701000

Cementitious material

Cement (kg/m3)
91
84
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
36 
Kazunogawa completed
Kazunogawa completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dongpi

Reservoir capacity: 480 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 04/09

Specifications

Height: 105 metres

Length: 422 metres

Volume of RCC: 485 m3x103

Total volume: 600 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.335Traditional concrete against formwork
Spillway
SlopeType
0.335Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
72
56
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
84 
Bailianya completed
Bailianya completed

Full Dam Information

Details

Country: Panama

Owner: -

Type: Arch-Gravity

Purpose(s): Hydropower

River: Changuinola

Reservoir capacity: 347 m3x106

Construction Dates

Start of Project: 04/07

Start of RCC: 04/07

End of RCC: 04/11

End of Project: 10/11

Specifications

Height: 105 metres

Length: 595 metres

Volume of RCC: 884 m3x103

Total volume: 910 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.50RCC against formwork (GEVR/GE-RCC)  [stepped face]
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.50Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
65
Pozzolan (kg/m3)Pozzolan Type
145Low-lime flyash (ASTM Class F)
150 
Changuinola 1 completed
Changuinola 1 completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Lancang

Reservoir capacity: 316 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: 03/12

Specifications

Height: 105 metres

Length: 356 metres

Volume of RCC: -

Total volume: 1067 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gongguoqiao completed
Gongguoqiao completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: You

Reservoir capacity: 536 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/13

End of Project: -/15

Specifications

Height: 105 metres

Length: 365 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wacun completed
Wacun completed

Full Dam Information

Details

Country: Bolivia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ivirizu

Reservoir capacity: -

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/22

End of Project: -/23

Specifications

Height: 105 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates