Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Asahi Ogawa | Japan | F H | Ogawa | 5 | 03/83 | 05/86 | 06/88 | 06/90 | 84 | 260 | 268 | 361 | V 0.90 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) | |
R'mil | Tunisia | I | R’mil | 44 | 08/99 | 10/00 | 05/01 | 11/01 | 18 | 260 | 64 | 160 | V | (15) | 0.90 | (16) | 0.90 | (12)* | 300 | 300 | 100 | 0 | (-) - | |
Sông Côn 2 | Vietnam | H | Song Con | 30 | - /06 | - /07 | - /09 | - /10 | 58 | 260 | ||||||||||||||
Akköy II (Aladereçam) | Turkey | H | Karaovacik | 14 | - /07 | 05/11 | 09/12 | - /13 | 60 | 260 | 226 | 306 | V | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 85 | 85 | (N) | |
Bouhdid | Algeria | F | Oued Bouhdid | 1 | - /18 | - /19 | - /20 | - /21 | 30 | 260 | 60 | 0.10 | 0.90 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Ogawa
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/83
Start of RCC: 03/83
End of RCC: 06/88
End of Project: 06/90
Specifications
Height: 84 metres
Length: 260 metres
Volume of RCC: 268 m3x103
Total volume: 361 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.90 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
180 | 500 |
Cementitious material
Cement (kg/m3) |
---|
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
24 | Low-lime flyash (ASTM Class F) |
Details
Country: Tunisia
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: R’mil
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 08/99
Start of RCC: 08/99
End of RCC: 05/01
End of Project: 11/01
Specifications
Height: 18 metres
Length: 260 metres
Volume of RCC: 64 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC supported by fill shoulders |
Downstream
Slope | Type |
---|---|
0.90 | Mechanically compacted unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Song Con
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 58 metres
Length: 260 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Karaovacik
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: 09/12
End of Project: -/13
Specifications
Height: 60 metres
Length: 260 metres
Volume of RCC: 226 m3x103
Total volume: 306 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
85 | Natural pozzolan (ASTM Class N) |
Details
Country: Algeria
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Oued Bouhdid
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/20
End of Project: -/21
Specifications
Height: 30 metres
Length: 260 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.10 |
Downstream
Slope | Type |
---|---|
0.90 |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates