Dam Search Results
- Total Volume: 1300 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Tashkumyr | Kyrgyzstan | H I | Naryn | 140 | - /82 | 03/87 | 12/89 | 12/90 | 75 | 320 | 100 | 1300 | V | (1) | 0.78 | (1) | 0.78 | (1) | 400 | 400 | 90 | 30 | (N) | |
Se San 4 | Vietnam | H | Poko | 54 | 12/04 | 03/05 | - /08 | - /09 | 74 | 834 | 753 | 1300 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 80 | 160 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Kyrgyzstan
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Naryn
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: -/82
Start of RCC: -/82
End of RCC: 12/89
End of Project: 12/90
Specifications
Height: 75 metres
Length: 320 metres
Volume of RCC: 100 m3x103
Total volume: 1300 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Natural pozzolan (ASTM Class N) |
Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Poko
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 74 metres
Length: 834 metres
Volume of RCC: 753 m3x103
Total volume: 1300 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
160 | Natural pozzolan (ASTM Class N) |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates