Dam Search Results
- Total Volume: 3538 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Bureya | Russia | F H | Bureya | 21000 | 01/76 | 01/85 | - /03 | - /09 | 139 | 810 | 709 | 3538 | V | (1) | 0.70 | (1) | 0.70 | (1) | 300 - 500 | 300 - 500 | 95 to 110 | 25 to 30 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Russia
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Bureya
Reservoir capacity: 21000 m3x106
Construction Dates
Start of Project: 01/76
Start of RCC: 01/76
End of RCC: -/03
End of Project: -/09
Specifications
Height: 139 metres
Length: 810 metres
Volume of RCC: 709 m3x103
Total volume: 3538 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
500 | 500 |
Cementitious material
Cement (kg/m3) |
---|
95 to |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
25 to | Natural pozzolan (ASTM Class N) |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates