Dam Search Results
- Reservoir Capacity: 26 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
San Rafael | Mexico | F H | Santiago | 26 | 11/93 | 05/94 | 07/94 | 07/94 | 48 | 176 | 81 | 110 | V | (5) | 0.66 0.80 | (3)* | separate | 300 | 300 | 90 | 130 | (N) | ||
Carnaúba | Brazil | I W | Quixeré | 26 | - /01 | 02/02 | 11/02 | - /03 | 19 | 700 | 300 | 300 | 100 | 0 | (-) - | |||||||||
Ntimbale | Botswana | W | 26 | 11/04 | 04/06 | 09/06 | 05/07 | 33 | 153 | 30 | ||||||||||||||
Niuqiao [A] | China | H | Qingtonghe | 26 | - /03 | - /05 | 12/06 | - /07 | 62 | 201 | 710 | |||||||||||||
Longqiao [A] | China | H R | Yu | 26 | 12/05 | 03/06 | 02/07 | 05/07 | 95 | 156 | 135 | 160 | curve | (3') | curve | (3) | (3) | |||||||
Liujiadong | China | H | Gui | 26 | - /06 | - /07 | - /08 | - /08 | 61 | 166 | 127 | |||||||||||||
Baishiya | China | H I W | Xijiang | 26 | - /04 | - /07 | - /09 | - /12 | 74 | 190 | 230 | 240 | 0.75 | |||||||||||
Wala Dam Raise | Jordan | G | Wala | 26 | 09/17 | 06/19 | 10/19 | 07/20 | 67 | 300 | 80 | 82 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 98 | 52 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Mexico
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Santiago
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 07/94
End of Project: 07/94
Specifications
Height: 48 metres
Length: 176 metres
Volume of RCC: 81 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.66 | RCC against formwork [stepped face] |
0.80 |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
130 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Quixeré
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: 11/02
End of Project: -/03
Specifications
Height: 19 metres
Length: 700 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
[stepped face] |
Spillway
Slope | Type |
---|---|
[stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Botswana
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: 09/06
End of Project: 05/07
Specifications
Height: 33 metres
Length: 153 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Qingtonghe
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: 12/06
End of Project: -/07
Specifications
Height: 62 metres
Length: 201 metres
Volume of RCC: -
Total volume: 710 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Recreation
River: Yu
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 12/05
Start of RCC: 12/05
End of RCC: 02/07
End of Project: 05/07
Specifications
Height: 95 metres
Length: 156 metres
Volume of RCC: 135 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork |
Spillway
Slope | Type |
---|---|
RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Gui
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 61 metres
Length: 166 metres
Volume of RCC: -
Total volume: 127 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Xijiang
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/09
End of Project: -/12
Specifications
Height: 74 metres
Length: 190 metres
Volume of RCC: 230 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Jordan
Owner: -
Type: Gravity
Purpose(s): Groundwater Recharge
River: Wala
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 09/17
Start of RCC: 09/17
End of RCC: 10/19
End of Project: 07/20
Specifications
Height: 67 metres
Length: 300 metres
Volume of RCC: 80 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.30 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
98 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
52 | Natural pozzolan (ASTM Class N) |