Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Kengkou | China | H W | Youxi | 27 | 11/84 | 11/85 | 04/86 | 11/86 | 57 | 123 | 43 | 62 | V | (9) | 0.75 | (10) | 0.75 | (13) | 250 & 500 | 250 & 500 | 60 60 | 120 80 | (F) | |
Monksville | USA | W | Wanaque | 27 | 05/85 | 03/86 | 08/86 | 11/86 | 48 | 670 | 219 | 232 | V | (1) | V 0.78 | (1) (17) | 0.78 | (1)* | 300 | 300 | 64 | 0 | (-) - | |
Camará | Brazil | W | Riachäo | 27 | 05/00 | 09/01 | 06/02 | - /02 | 56 | 296 | V | (1) | 0.80 | (1) | 300 | 300 | 80 | 0 | (-) - | |||||
Passo do Meio | Brazil | H | das Antas | 27 | - /07 | - /08 | - /09 | - /10 | 31 | 110 | ||||||||||||||
Braamhoek | South Africa | H | Braamhoekspruit | 27 | 04/08 | 06/09 | 06/10 | 02/11 | 37 | 330 | 90 | 98 | V | (3') | 0.67 | (3')* | 0.67 | (3')* | 300 | 1200 | 70 | 95 | (F) | |
Narli | Turkey | H | Göksu | 27 | - /16 | - /17 | - /18 | - /19 | 47 | 153 | 49 | 68 | (14) | (14) | 300 | 300 | 65 | 50 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Youxi
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 04/86
End of Project: 11/86
Specifications
Height: 57 metres
Length: 123 metres
Volume of RCC: 43 m3x103
Total volume: 62 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 & | 250 & |
500 | 500 |
Cementitious material
Cement (kg/m3) |
---|
60 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Low-lime flyash (ASTM Class F) |
80 |
Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Wanaque
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/85
Start of RCC: 05/85
End of RCC: 08/86
End of Project: 11/86
Specifications
Height: 48 metres
Length: 670 metres
Volume of RCC: 219 m3x103
Total volume: 232 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.78 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Riachäo
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 06/02
End of Project: -/02
Specifications
Height: 56 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 31 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Braamhoekspruit
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 06/10
End of Project: 02/11
Specifications
Height: 37 metres
Length: 330 metres
Volume of RCC: 90 m3x103
Total volume: 98 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.67 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.67 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
95 | Low-lime flyash (ASTM Class F) |
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 47 metres
Length: 153 metres
Volume of RCC: 49 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Slip-formed/extruded facing elements |
Downstream
Slope | Type |
---|---|
Slip-formed/extruded facing elements |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | Low-lime flyash (ASTM Class F) |