Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Saco de Nova OlindaBrazilF I WGravata9707/8507/8610/8606/8756230132143V(1)0.80(3)*separate 4004005515(N)
Sishanping
[A]
ChinaF H ILeishui3- /92- /93- /94- /9556147 18          (F)
Pedro Moura Junior (formerly Belo Jardim)BrazilWIpojuca (Gravata)3705/9509/96- /97- /9856380113125 (1) (1)* (1)*3003006416(N)
CamaráBrazilWRiachäo2705/0009/0106/02- /0256296  V(1)0.80(1)  300300800(-) -
TizidongChinaHApeng2508/0110/0210/0311/035619372161 (12) (12) (12)    (F)
WangkengChinaHTangkouxi15- /01- /02- /03- /04561593840          (F)
ChangzhouChinaHXunjiang56- /93- /02- /05- /0756              
Huizhou PSS - Upper damChinaHXiaojinhe3010/0412/0505/07- /11561688493V(1)0.75(1)0.70(1)30030064125(F)
ShihuChinaF I WLituohe58- /05- /06- /07- /0856193162354           
São SimãoBrazilHItapemirim11- /06- /07- /0802/095618792115           
Bajo FríoPanamaHChiriqui Viejo - /12- /13- /13- /145640687272           
Ibn HammadJordanG WIbn Hammad4- /1512/1607/17- /22561601601600.30(1)0.70(1)*0.70(1)*30030090
100
0
0
(-) -
Saddle Dam D (Xe-Pian Xe-Namnoy)LaosHXepian104310/1804/1910/19- /1956430170200V   none 300300  (F)
Gürsöğüt 2TurkeyHSakarya10- /19- /19- /20- /2156275262            
Dashte PalangIranF I WDashte Palang15107/13- /22- /24- /2556350540690           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Gravata

Reservoir capacity: 97 m3x106

Construction Dates

Start of Project: 07/85

Start of RCC: 07/85

End of RCC: 10/86

End of Project: 06/87

Specifications

Height: 56 metres

Length: 230 metres

Volume of RCC: 132 m3x103

Total volume: 143 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Saco de Nova Olinda completed
Saco de Nova Olinda completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation

River: Leishui

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 56 metres

Length: 147 metres

Volume of RCC: -

Total volume: 18 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Ipojuca (Gravata)

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: 05/95

Start of RCC: 05/95

End of RCC: -/97

End of Project: -/98

Specifications

Height: 56 metres

Length: 380 metres

Volume of RCC: 113 m3x103

Total volume: 125 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
 Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)
  
Pedro Moura Junior (formerly Belo Jardim) completed
Pedro Moura Junior (formerly Belo Jardim) completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Riachäo

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: 05/00

Start of RCC: 05/00

End of RCC: 06/02

End of Project: -/02

Specifications

Height: 56 metres

Length: 296 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Camará completed
Camará completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Apeng

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: 08/01

Start of RCC: 08/01

End of RCC: 10/03

End of Project: 11/03

Specifications

Height: 56 metres

Length: 193 metres

Volume of RCC: 72 m3x103

Total volume: 161 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tangkouxi

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/03

End of Project: -/04

Specifications

Height: 56 metres

Length: 159 metres

Volume of RCC: 38 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Xunjiang

Reservoir capacity: 56 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/05

End of Project: -/07

Specifications

Height: 56 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Changzhou on Google Earth
Changzhou on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Xiaojinhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: 05/07

End of Project: -/11

Specifications

Height: 56 metres

Length: 168 metres

Volume of RCC: 84 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
125Low-lime flyash (ASTM Class F)
  
Huizhou PSS - Upper dam on Google Earth
Huizhou PSS - Upper dam on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Lituohe

Reservoir capacity: 58 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 56 metres

Length: 193 metres

Volume of RCC: 162 m3x103

Total volume: 354 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shihu completed
Shihu completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Itapemirim

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: 02/09

Specifications

Height: 56 metres

Length: 187 metres

Volume of RCC: 92 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Simão on Google Earth
São Simão on Google Earth

Full Dam Information

Details

Country: Panama

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Chiriqui Viejo

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: -/14

Specifications

Height: 56 metres

Length: 406 metres

Volume of RCC: 87 m3x103

Total volume: 272 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bajo Frío completed
Bajo Frío completed

Full Dam Information

Details

Country: Jordan

Owner: -

Type: Gravity

Purpose(s): Groundwater Recharge / Water Supply

River: Ibn Hammad

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: 07/17

End of Project: -/22

Specifications

Height: 56 metres

Length: 160 metres

Volume of RCC: 160 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
0 
Ibn Hammad completed
Ibn Hammad completed

Full Dam Information

Details

Country: Laos

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Xepian

Reservoir capacity: 1043 m3x106

Construction Dates

Start of Project: 10/18

Start of RCC: 10/18

End of RCC: 10/19

End of Project: -/19

Specifications

Height: 56 metres

Length: 430 metres

Volume of RCC: 170 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
    [stepped face]
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Saddle Dam D (Xe-Pian Xe-Namnoy) on Google Earth
Saddle Dam D (Xe-Pian Xe-Namnoy) on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/21

Specifications

Height: 56 metres

Length: 275 metres

Volume of RCC: 262 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gürsöğüt 2 completed
Gürsöğüt 2 completed

Full Dam Information

Details

Country: Iran

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Dashte Palang

Reservoir capacity: 151 m3x106

Construction Dates

Start of Project: 07/13

Start of RCC: 07/13

End of RCC: -/24

End of Project: -/25

Specifications

Height: 56 metres

Length: 350 metres

Volume of RCC: 540 m3x103

Total volume: 690 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dashte Palang under construction
Dashte Palang under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates