SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Urugua-iArgentinaHUrugua-i117510/8504/8804/89- /8977687590626V(6)0.80(17)0.80(1)400400600(-) -
Qilinguan
[A]
ChinaHNanhe14- /05- /06- /07- /08771404555           
FuzikouChinaF HLijiang18811/11- /12- /13- /1477239 304           
UludereTurkeyHOrtasu17- /08- /12- /16- /18774318008870.10(1)0.80(1)  3003009545(N)
YanagawaJapanF H WYana19- /15- /18- /21- /2377243 233           
FaskMoroccoF I WAssayad7907/1701/1912/2207/23778301400 0.10(1)0.80(1)0.80(1)300300  (N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Argentina

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Urugua-i

Reservoir capacity: 1175 m3x106

Construction Dates

Start of Project: 10/85

Start of RCC: 10/85

End of RCC: 04/89

End of Project: -/89

Specifications

Height: 77 metres

Length: 687 metres

Volume of RCC: 590 m3x103

Total volume: 626 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Unformed face of RCC
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Urugua-i completed
Urugua-i completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Nanhe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 77 metres

Length: 140 metres

Volume of RCC: 45 m3x103

Total volume: 55 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Lijiang

Reservoir capacity: 188 m3x106

Construction Dates

Start of Project: 11/11

Start of RCC: 11/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 77 metres

Length: 239 metres

Volume of RCC: -

Total volume: 304 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fuzikou under construction
Fuzikou under construction

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/16

End of Project: -/18

Specifications

Height: 77 metres

Length: 431 metres

Volume of RCC: 800 m3x103

Total volume: 887 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Uludere completed
Uludere completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Yana

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/21

End of Project: -/23

Specifications

Height: 77 metres

Length: 243 metres

Volume of RCC: -

Total volume: 233 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yanagawa under construction
Yanagawa under construction

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Assayad

Reservoir capacity: 79 m3x106

Construction Dates

Start of Project: 07/17

Start of RCC: 07/17

End of RCC: 12/22

End of Project: 07/23

Specifications

Height: 77 metres

Length: 830 metres

Volume of RCC: 1400 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)
  
Fask under construction
Fask under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates