SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
BaishiChinaF H I WDalinghe164509/9604/9709/9912/0049513111603V
0.10
(1)
(1)
0.70(1)0.76(1)3003007258(F)
Ulu Jelai/SusuMalaysiaHBertam, Telom and Lemoi1803/1103/1409/1507/1690513731747V(4')0.80(3')*0.80(1)*4002400100
95
0
0
(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dalinghe

Reservoir capacity: 1645 m3x106

Construction Dates

Start of Project: 09/96

Start of RCC: 09/96

End of RCC: 09/99

End of Project: 12/00

Specifications

Height: 49 metres

Length: 513 metres

Volume of RCC: 111 m3x103

Total volume: 603 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
58Low-lime flyash (ASTM Class F)
  
Baishi completed
Baishi completed

Full Dam Information

Details

Country: Malaysia

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bertam, Telom and Lemoi

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 03/11

Start of RCC: 03/11

End of RCC: 09/15

End of Project: 07/16

Specifications

Height: 90 metres

Length: 513 metres

Volume of RCC: 731 m3x103

Total volume: 747 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
4002400

Cementitious material

Cement (kg/m3)
100
95
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
0 
Ulu Jelai/Susu completed
Ulu Jelai/Susu completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates