Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Caraibas - CEMIGBrazilF ICaraibas1004/9007/9009/9002/912616018220.10(1)0.80(3)*0.80(1)*3003007020(N)
ShowkahUAEG I 1- /0008/0110/01- /012410518200.10(11)0.80(1)*0.80(12)300300900(-) -
Ait Moulay AhmedMoroccoI WAin Leuh210/09- /1001/1110/11291361820V(5)0.75(1)*0.75(1)*3003007030(N)
LaananatMoroccoW 1- /09- /10- /11- /1215 18200.20(5)0.80(1)*0.80(1)*     

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation

River: Caraibas

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 04/90

Start of RCC: 04/90

End of RCC: 09/90

End of Project: 02/91

Specifications

Height: 26 metres

Length: 160 metres

Volume of RCC: 18 m3x103

Total volume: 22 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
20Natural pozzolan (ASTM Class N)
  
Caraibas - CEMIG completed
Caraibas - CEMIG completed

Full Dam Information

Details

Country: UAE

Owner: -

Type: Gravity

Purpose(s): Groundwater Recharge / Irrigation

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: 10/01

End of Project: -/01

Specifications

Height: 24 metres

Length: 105 metres

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Reinforced conventional concrete cast before RCC placement
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Showkah completed
Showkah completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Ain Leuh

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 10/09

Start of RCC: 10/09

End of RCC: 01/11

End of Project: 10/11

Specifications

Height: 29 metres

Length: 136 metres

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Ait Moulay Ahmed completed
Ait Moulay Ahmed completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 15 metres

Length: -

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates