Dam Search Results
- Total Volume: 53 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
San Lazaro | Mexico | F G W | San Lazaro | 11 | 10/85 | 04/94 | 06/94 | 07/94 | 37 | 176 | 35 | 53 | V 0.20 | (5) | 0.80 | (3)* | 0.80 | (13) | 300 | 300 | 100 90 | 220 220 | (M) | |
Krayma | Morocco | W | Tiyoughza | 3 | - /09 | - /10 | - /11 | - /12 | 32 | 45 | 53 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 120 100 | 0 | (-) - |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Mexico
Owner: -
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Water Supply
River: San Lazaro
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 06/94
End of Project: 07/94
Specifications
Height: 37 metres
Length: 176 metres
Volume of RCC: 35 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
0.20 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
100 |
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
220 | Milled sand |
220 |
Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tiyoughza
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 32 metres
Length: -
Volume of RCC: 45 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.20 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
120 |
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates