Dam Search Results
- Reservoir Capacity: 24 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Wolwedans [A-G] | South Africa | W | Great Brak | 24 | 11/87 | 10/88 | 10/89 | 11/90 | 70 | 268 | 180 | 210 | V | (1) | 0.50 | (1)* | 0.50 | (1)* | 250 | 250 | 58 | 136 | (F) | |
Val da Serra | Brazil | W | Ibicui-Mirim | 24 | 07/97 | 11/97 | 07/98 | 11/98 | 37 | 675 | 69 | 95 | V | (13) | (12)* | (12)* | 300 | 300 | 90 | 30 | (F) | |||
Estreito | Brazil | F I R W | Curimatá | 24 | - /97 | - /00 | - /01 | 11/02 | 26 | 300 | 12 | 14 | 300 | 300 | 64 | 16 | (N) | |||||||
Pezzi | Brazil | H | das Antas | 24 | - /11 | - /12 | - /12 | - /13 | 42 | 44 | 80 | 76 | 19 | (N) | ||||||||||
Serra dos Cavalinhos II | Brazil | H | das Antas | 24 | - /11 | - /12 | - /12 | - /13 | 42 | 123 | 33 | 80 | 72 | 18 | (N) | |||||||||
Guanchang | China | H I W | w | 24 | - /14 | - /15 | - /16 | - /17 | 54 | 246 | ||||||||||||||
Aldegirmen | Turkey | I W | Akasya | 24 | - /17 | - /20 | - /23 | - /24 | 59 | 227 | 189 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 55 | 45 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: South Africa
Owner: -
Type: Arch-Gravity
Purpose(s): Water Supply
River: Great Brak
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 10/89
End of Project: 11/90
Specifications
Height: 70 metres
Length: 268 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
58 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
136 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ibicui-Mirim
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 07/97
Start of RCC: 07/97
End of RCC: 07/98
End of Project: 11/98
Specifications
Height: 37 metres
Length: 675 metres
Volume of RCC: 69 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Low-lime flyash (ASTM Class F) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Curimatá
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 11/02
Specifications
Height: 26 metres
Length: 300 metres
Volume of RCC: 12 m3x103
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: -
Volume of RCC: 44 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
76 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
19 | Natural pozzolan (ASTM Class N) |
Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: 123 metres
Volume of RCC: 33 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: w
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 54 metres
Length: 246 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Akasya
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/23
End of Project: -/24
Specifications
Height: 59 metres
Length: 227 metres
Volume of RCC: -
Total volume: 189 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 | Low-lime flyash (ASTM Class F) |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates