Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Monte ClaroBrazilHDas Antas2304/02- /03- /0412/04251803566        75  
KelebekTurkeyI WKelebek23- /12- /14- /16- /176219374970.10(1)0.80(1)0.80(12)300300120 (F)
Panelas IIBrazilW 23- /16- /1706/19- /2055              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Das Antas

Reservoir capacity: 23 m3x106

Construction Dates

Start of Project: 04/02

Start of RCC: 04/02

End of RCC: -/04

End of Project: 12/04

Specifications

Height: 25 metres

Length: 180 metres

Volume of RCC: 35 m3x103

Total volume: 66 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
  
  
Monte Claro completed
Monte Claro completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Kelebek

Reservoir capacity: 23 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/17

Specifications

Height: 62 metres

Length: 193 metres

Volume of RCC: 74 m3x103

Total volume: 97 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Kelebek completed
Kelebek completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 23 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: 06/19

End of Project: -/20

Specifications

Height: 55 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Panelas II on Google Earth
Panelas II on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates