SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
ShimagawaJapanF WShima903/91- /9405/9603/9890330390516V
0.50
(1)
(1)
0.80(1)0.80(1)2507508436(F)
BraamhoekSouth AfricaHBraamhoekspruit2704/0806/0906/1002/11373309098V(3')0.67(3')*0.67(3')*30012007095(F)
Sariveliler GöktepeTurkeyIGelenalan1- /13- /14- /15- /153933069         600(-) -
TaquarembóBrazilWTaquarembó 05/08- /10- /19- /2033330             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Shima

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 03/91

Start of RCC: 03/91

End of RCC: 05/96

End of Project: 03/98

Specifications

Height: 90 metres

Length: 330 metres

Volume of RCC: 390 m3x103

Total volume: 516 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.50Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Shimagawa completed
Shimagawa completed

Full Dam Information

Details

Country: South Africa

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Braamhoekspruit

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 06/10

End of Project: 02/11

Specifications

Height: 37 metres

Length: 330 metres

Volume of RCC: 90 m3x103

Total volume: 98 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.67RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.67RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Braamhoek completed
Braamhoek completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Gelenalan

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/15

Specifications

Height: 39 metres

Length: 330 metres

Volume of RCC: 69 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Sariveliler Göktepe completed
Sariveliler Göktepe completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Taquarembó

Reservoir capacity: -

Construction Dates

Start of Project: 05/08

Start of RCC: 05/08

End of RCC: -/19

End of Project: -/20

Specifications

Height: 33 metres

Length: 330 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Taquarembó under construction
Taquarembó under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates