Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
AntacotoPeruMantaro120- /98- /98- /99- /9917             (-) -
CapillucasPeruHCanete501/0710/0804/0910/09346075750.375(3')0.75(3')*  3003006590(N)
Cerro del ÁguilaPeruHMantaro3711/1208/1406/15- /16892702504500.10(1)0.75(1)*0.75(12)30060011523 

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Peru

Owner: -

Type: Gravity

Purpose(s): unknown

River: Mantaro

Reservoir capacity: 120 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/99

End of Project: -/99

Specifications

Height: 17 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 No pozzolan used  -
  
Antacoto completed
Antacoto completed

Full Dam Information

Details

Country: Peru

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Canete

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: 04/09

End of Project: 10/09

Specifications

Height: 34 metres

Length: 60 metres

Volume of RCC: 75 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.375RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
90Natural pozzolan (ASTM Class N)
  
Capillucas completed
Capillucas completed

Full Dam Information

Details

Country: Peru

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Mantaro

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: 11/12

Start of RCC: 11/12

End of RCC: 06/15

End of Project: -/16

Specifications

Height: 89 metres

Length: 270 metres

Volume of RCC: 250 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
115
Pozzolan (kg/m3)Pozzolan Type
23 
  
Cerro del Águila completed
Cerro del Águila completed

 

Search again