Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Imi el KhengMoroccoG IOued Berhil1204/9209/9207/9304/9439170971090.20(5)0.80(1)*0.80(1)*300300100
110
20
20
(N)
Clifford D. Craig (formerly Spring Hollow)USAWoff-stream1210/9203/9308/93- /9474302222223V(6)0.80(17)none 3003005353(F)
OhmatsugawaJapanF H WMatsu1207/9010/9206/9509/9665296141294V
0.70
(1)
(1)
0.76(1)0.76(1)2507509139(F)
EnjilMoroccoI WTaghoucht1211/9303/9410/9503/96368045570.20(5)0.80(1)*0.80(1)*300300110
150
0
0
(N)
ShiokawaJapanF I WShio1205/9308/9311/9503/99792252993880.10
0.70
(1)
(1)
0.76(1)0.76(1)2507509624(F)
KazunogawaJapanHTuchimuro1211/9208/9507/9711/99105264428622V
0.10
(1)
(1)
0.82(1)0.82(1)170100091
84
39
36
(F)
Guilman-AmorinBrazilHPiracicaba12- /97- /98- /99- /004149985102      3003008020(N)
Shuangkengkou
[A]
ChinaHXiaoxihe12- /99- /00- /01- /0268              
Tangkeng
[A]
ChinaHGuxi12- /03- /04- /05- /0566    (12) (12) (12)     
Linha EmiliaBrazilHCarreiro12- /06- /07- /07- /08302053554           
VacaBelizeHMarcal1202/0702/0810/0912/11702252002200.20(1)0.75(3')*0.75(12)30030009431(F)
ArvoredoBrazilHIrani12- /08- /09- /0904/10392505381V 0.75 0.75   8020(N)
Corrente GrandeBrazilHCorrente Grande12- /10- /10- /10- /1020110  V 0.75 0.75      
Shangshui
[A]
ChinaI W 12- /13- /15- /17- /1858269             
UchigataniJapanF HUchigatani12- /14- /18- /21- /2384270 328           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Groundwater Recharge / Irrigation

River: Oued Berhil

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 04/92

Start of RCC: 04/92

End of RCC: 07/93

End of Project: 04/94

Specifications

Height: 39 metres

Length: 170 metres

Volume of RCC: 97 m3x103

Total volume: 109 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
110
Pozzolan (kg/m3)Pozzolan Type
20Natural pozzolan (ASTM Class N)
20 
Imi el Kheng completed
Imi el Kheng completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: off-stream

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 10/92

Start of RCC: 10/92

End of RCC: 08/93

End of Project: -/94

Specifications

Height: 74 metres

Length: 302 metres

Volume of RCC: 222 m3x103

Total volume: 223 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Unformed face of RCC
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
53
Pozzolan (kg/m3)Pozzolan Type
53Low-lime flyash (ASTM Class F)
  
Clifford D. Craig (formerly Spring Hollow) completed
Clifford D. Craig (formerly Spring Hollow) completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Matsu

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 06/95

End of Project: 09/96

Specifications

Height: 65 metres

Length: 296 metres

Volume of RCC: 141 m3x103

Total volume: 294 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.70Traditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Ohmatsugawa completed
Ohmatsugawa completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Taghoucht

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 11/93

Start of RCC: 11/93

End of RCC: 10/95

End of Project: 03/96

Specifications

Height: 36 metres

Length: 80 metres

Volume of RCC: 45 m3x103

Total volume: 57 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
150
Pozzolan (kg/m3)Pozzolan Type
0Natural pozzolan (ASTM Class N)
0 
Enjil on Google Earth
Enjil on Google Earth

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Shio

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 05/93

Start of RCC: 05/93

End of RCC: 11/95

End of Project: 03/99

Specifications

Height: 79 metres

Length: 225 metres

Volume of RCC: 299 m3x103

Total volume: 388 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
0.70Traditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
96
Pozzolan (kg/m3)Pozzolan Type
24Low-lime flyash (ASTM Class F)
  
Shiokawa completed
Shiokawa completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tuchimuro

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 07/97

End of Project: 11/99

Specifications

Height: 105 metres

Length: 264 metres

Volume of RCC: 428 m3x103

Total volume: 622 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.82Traditional concrete against formwork
Spillway
SlopeType
0.82Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
1701000

Cementitious material

Cement (kg/m3)
91
84
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
36 
Kazunogawa completed
Kazunogawa completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Piracicaba

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/97

Start of RCC: -/97

End of RCC: -/99

End of Project: -/00

Specifications

Height: 41 metres

Length: 499 metres

Volume of RCC: 85 m3x103

Total volume: 102 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
20Natural pozzolan (ASTM Class N)
  
Guilman-Amorin completed
Guilman-Amorin completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/01

End of Project: -/02

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Guxi

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/05

Specifications

Height: 66 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Carreiro

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: -/08

Specifications

Height: 30 metres

Length: 205 metres

Volume of RCC: 35 m3x103

Total volume: 54 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Linha Emilia completed
Linha Emilia completed

Full Dam Information

Details

Country: Belize

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Marcal

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 02/07

Start of RCC: 02/07

End of RCC: 10/09

End of Project: 12/11

Specifications

Height: 70 metres

Length: 225 metres

Volume of RCC: 200 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
94
Pozzolan (kg/m3)Pozzolan Type
31Low-lime flyash (ASTM Class F)
  
Vaca completed
Vaca completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Irani

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/09

End of Project: 04/10

Specifications

Height: 39 metres

Length: 250 metres

Volume of RCC: 53 m3x103

Total volume: 81 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
20Natural pozzolan (ASTM Class N)
  
Arvoredo completed
Arvoredo completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Corrente Grande

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/10

End of Project: -/10

Specifications

Height: 20 metres

Length: 110 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Corrente Grande completed
Corrente Grande completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Irrigation / Water Supply

River: -

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/17

End of Project: -/18

Specifications

Height: 58 metres

Length: 269 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Uchigatani

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/21

End of Project: -/23

Specifications

Height: 84 metres

Length: 270 metres

Volume of RCC: -

Total volume: 328 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Uchigatani on Google Earth
Uchigatani on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates