Dam Search Results
- Reservoir Capacity: 3 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Thornlea | South Africa | I | Mlazi | 3 | 06/90 | 10/90 | 12/90 | 02/91 | 17 | 135 | 16 | 17 | V | (1) | 0.90 | (3)* | 0.90 | (1) | 170 | 170 | 38 | 87 | (S) | |
| Burguillos del Cerro | Spain | W | Ribera de los Montes | 3 | 12/90 | 05/91 | 09/91 | 12/91 | 24 | 167 | 25 | 33 | V | (14) | 0.13 0.60 | (14)* | 0.60 | (13)* | 300 | 300 | 80 | 135 | (F) | |
| Arriarán | Spain | W | Arriarán | 3 | 10/91 | 04/92 | 09/92 | 02/94 | 58 | 206 | 110 | 113 | 0.05 | (3) | 0.70 | (3)* | 0.70 | (3)* | 300 | 300 | 85 | 135 | (F) | |
| Zintel Canyon | USA | F | Zintel | 3 | 03/92 | 07/92 | 10/92 | 12/92 | 39 | 158 | 54 | 55 | V | (7) | 0.85 | (17) | 0.85 | (17) | 300 | 300 | 74 | 0 | (-) - | |
| Sishanping [A] | China | F H I | Leishui | 3 | - /92 | - /93 | - /94 | - /95 | 56 | 147 | 18 | (F) | ||||||||||||
| New Peterson Lake | USA | W | Tributary of Cache La Poudre | 3 | 05/95 | 09/95 | 11/95 | 12/95 | 21 | 70 | 7 | 8 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 145 | 48 | (F) | |
| Tie Hack | USA | W | South Fork Clear Creek | 3 | 05/96 | 10/96 | 08/97 | - /97 | 41 | 170 | 62 | 69 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 89 | 83 | (F) | |
| Hongpo [A-G] | China | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) | |
| Fukuchiyama | Japan | F N W | Fukuti | 3 | 10/98 | - /99 | 12/01 | 03/03 | 65 | 255 | 115 | 201 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) | |
| Peixe Angical | Brazil | H | Tocantins | 3 | 04/02 | - /04 | - /05 | 09/06 | 39 | 400 | 500 | 582 | 300 | 300 | 70 | 0 | (-) - | |||||||
| Ghatghar (Lower dam) | India | H | Shahi Nallah | 3 | 12/01 | 12/04 | 05/06 | 03/07 | 86 | 447 | 638 | 646 | 0.141 | (3') | 0.782 | (3')* | 0.782 | (3')* | 300 | 300 | 75 | 150 | (F) | |
| Akköy I | Turkey | H | Harsit | 3 | 07/05 | 10/06 | 04/07 | 09/08 | 38 | 144 | 87 | 101 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 100 | 100 | (N) | |
| Elkwater Fork | USA | W | Tygart Tributory | 3 | - /06 | 04/07 | 08/07 | - /07 | 39 | 204 | 106 | 113 | V | (8) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 59 | 89 | (F) | |
| Ulu Sepri (formerly Batu Hampar) | Malaysia | W | Batu Hampar | 3 | 11/07 | 10/09 | 04/10 | 05/10 | 65 | 236 | 200 | 203 | (3') | (10) | (10) | 300 | 1200 | 65 | 120 | (F) | ||||
| Shaizhu [A] | China | H | Xima | 3 | - /06 | - /08 | - /10 | - /11 | 72 | 160 | 100 | |||||||||||||
| Saizhu [A] | China | H | Xima | 3 | 04/06 | - /09 | - /10 | - /11 | 72 | 160 | 107 | 115 | curve | (3') | curve | (3') | (3) | |||||||
| Ahl Lafouim | Morocco | W | 3 | - /09 | - /10 | - /11 | - /12 | 15 | 20 | 24 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | ||||||||
| Krayma | Morocco | W | Tiyoughza | 3 | - /09 | - /10 | - /11 | - /12 | 32 | 45 | 53 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 120 100 | 0 | (-) - | ||||
| Güneysinir Alanözü | Turkey | I | Yangılı | 3 | - /13 | - /14 | - /15 | - /15 | 38 | 270 | 71 | |||||||||||||
| Cacimba Nova | Brazil | I W | 3 | - /13 | - /14 | - /16 | - /16 | 18 | 196 | 52 | ||||||||||||||
| Divaresh | Iran | I W | Kharshak | 3 | - /13 | - /15 | - /21 | - /23 | 45 | 195 | ||||||||||||||
| Gümüshane Bahçecik | Turkey | W | Şenkale Deresi | 3 | 06/17 | 11/18 | - /21 | - /22 | 67 | 273 | 148 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | (N) | ||||||
| Akçali-1 | Turkey | I | Sağın Creek | 3 | - /16 | - /19 | - /23 | - /24 | 43 | 291 | 120 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | (F) | ||||
| Bahçecik | Turkey | W | 3 | - /16 | - /19 | - /23 | - /24 | 69 | 204 | |||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: South Africa
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Mlazi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/90
End of Project: 02/91
Specifications
Height: 17 metres
Length: 135 metres
Volume of RCC: 16 m3x103
Total volume: 17 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 170 | 170 |
Cementitious material
| Cement (kg/m3) |
|---|
| 38 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 87 | Ground-granulated blast-furnace slag |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Ribera de los Montes
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 09/91
End of Project: 12/91
Specifications
Height: 24 metres
Length: 167 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.13 | Slip-formed/extruded facing elements [stepped face] |
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Arriarán
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 09/92
End of Project: 02/94
Specifications
Height: 58 metres
Length: 206 metres
Volume of RCC: 110 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Zintel
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 03/92
Start of RCC: 03/92
End of RCC: 10/92
End of Project: 12/92
Specifications
Height: 39 metres
Length: 158 metres
Volume of RCC: 54 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used - |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation
River: Leishui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 56 metres
Length: 147 metres
Volume of RCC: -
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tributary of Cache La Poudre
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 11/95
End of Project: 12/95
Specifications
Height: 21 metres
Length: 70 metres
Volume of RCC: 7 m3x103
Total volume: 8 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 145 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: South Fork Clear Creek
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 08/97
End of Project: -/97
Specifications
Height: 41 metres
Length: 170 metres
Volume of RCC: 62 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 83 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Fukuti
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: 12/01
End of Project: 03/03
Specifications
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/02
Start of RCC: 04/02
End of RCC: -/05
End of Project: 09/06
Specifications
Height: 39 metres
Length: 400 metres
Volume of RCC: 500 m3x103
Total volume: 582 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used - |

Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Shahi Nallah
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/06
End of Project: 03/07
Specifications
Height: 86 metres
Length: 447 metres
Volume of RCC: 638 m3x103
Total volume: 646 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.141 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.782 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.782 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 150 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Harsit
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 04/07
End of Project: 09/08
Specifications
Height: 38 metres
Length: 144 metres
Volume of RCC: 87 m3x103
Total volume: 101 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tygart Tributory
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: 08/07
End of Project: -/07
Specifications
Height: 39 metres
Length: 204 metres
Volume of RCC: 106 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: Malaysia
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Batu Hampar
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: 04/10
End of Project: 05/10
Specifications
Height: 65 metres
Length: 236 metres
Volume of RCC: 200 m3x103
Total volume: 203 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: -
Total volume: 100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/06
Start of RCC: 04/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: 107 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: -
Volume of RCC: 20 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Tiyoughza
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 32 metres
Length: -
Volume of RCC: 45 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used - |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Yangılı
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/15
Specifications
Height: 38 metres
Length: 270 metres
Volume of RCC: 71 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/16
Specifications
Height: 18 metres
Length: 196 metres
Volume of RCC: 52 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kharshak
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/21
End of Project: -/23
Specifications
Height: 45 metres
Length: 195 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Şenkale Deresi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/17
Start of RCC: 06/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 67 metres
Length: 273 metres
Volume of RCC: 148 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Sağın Creek
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 43 metres
Length: 291 metres
Volume of RCC: 120 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 69 metres
Length: -
Volume of RCC: 204 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates