Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
SatsunaigawaJapanF H I WSatsunai5402/8704/9110/9503/991143005367700.40(1)0.80(1)0.80(1)2507507842(S)
OrigawaJapanF NOri1502/9311/9607/0003/04114331673742V
0.60
(1)
(1)
0.77(1)0.77(1)2507509139(F)
Luoboba
[A]
ChinaF H RLengshui87- /07- /09- /10- /111141922121          (F)
Song Bung 4VietnamHVu Gia511- /1006/1204/1410/14114345852963V
0.40
 0.80   30030080
60
120
140
(N) &
(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Satsunai

Reservoir capacity: 54 m3x106

Construction Dates

Start of Project: 02/87

Start of RCC: 02/87

End of RCC: 10/95

End of Project: 03/99

Specifications

Height: 114 metres

Length: 300 metres

Volume of RCC: 536 m3x103

Total volume: 770 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.40Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
78
Pozzolan (kg/m3)Pozzolan Type
42Ground-granulated blast-furnace slag
  
Satsunaigawa completed
Satsunaigawa completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Navigation

River: Ori

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: 02/93

Start of RCC: 02/93

End of RCC: 07/00

End of Project: 03/04

Specifications

Height: 114 metres

Length: 331 metres

Volume of RCC: 673 m3x103

Total volume: 742 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.77Traditional concrete against formwork
Spillway
SlopeType
0.77Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Origawa completed
Origawa completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Recreation

River: Lengshui

Reservoir capacity: 87 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 114 metres

Length: 192 metres

Volume of RCC: 21 m3x103

Total volume: 21 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Luoboba completed
Luoboba completed

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Vu Gia

Reservoir capacity: 511 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: 04/14

End of Project: 10/14

Specifications

Height: 114 metres

Length: 345 metres

Volume of RCC: 852 m3x103

Total volume: 963 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.40 
Downstream
SlopeType
0.80 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
60
Pozzolan (kg/m3)Pozzolan Type
120Natural pozzolan (ASTM Class N)  &
140Low-lime flyash (ASTM Class F)
Song Bung 4 completed
Song Bung 4 completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates