Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Victoria replacementUSAHWest Branch 1304/9108/9110/9106/92371003640V(12)0.80(3)*0.80(3)*3003006767(C)
San LazaroMexicoF G WSan Lazaro1110/8504/9406/9407/94371763553V
0.20
(5)0.80(3)*0.80(13)300300100
90
220
220
(M)
MantaichengChinaH IGayahe1008/9201/9312/9608/973733778100V(1)0.75(10)ogee
0.70
(1)
(1)
300100060120(F)
Val da SerraBrazilWIbicui-Mirim2407/9711/9707/9811/98376756995V(13) (12)* (12)*3003009030(F)
RosalBrazilHItabapoana1704/98- /9809/99- /00372124575 (1) (3)* (1)*3003004555(S)
Quatorze (XIV) de JulhoBrazilHDas Antas55- /05- /06- /0710/083728175212V 1.30 1.30   7515(N)
Sehb el MergaMoroccoF I WSehb el Merga706/07- /08- /09- /10374808595V(5)0.80(1)*0.80(1)*3003006525(N)
BraamhoekSouth AfricaHBraamhoekspruit2704/0806/0906/1002/11373309098V(3')0.67(3')*0.67(3')*30012007095(F)
Grand PoubaraGabonHOgooué 11/08- /10- /1208/1337300          105
96
70
64
(F)
BonyicPanamaHBonyic1- /11- /1308/14- /1537165 88           
ZimariTurkeyWZimari2- /18- /21- /23- /2437126 80           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: West Branch

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 04/91

Start of RCC: 04/91

End of RCC: 10/91

End of Project: 06/92

Specifications

Height: 37 metres

Length: 100 metres

Volume of RCC: 36 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
67
Pozzolan (kg/m3)Pozzolan Type
67High-lime flyash (ASTM Class C)
  
Victoria replacement completed
Victoria replacement completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control / Groundwater Recharge / Water Supply

River: San Lazaro

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 10/85

Start of RCC: 10/85

End of RCC: 06/94

End of Project: 07/94

Specifications

Height: 37 metres

Length: 176 metres

Volume of RCC: 35 m3x103

Total volume: 53 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.20 
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
90
Pozzolan (kg/m3)Pozzolan Type
220Milled sand
220 
San Lazaro completed
San Lazaro completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Gayahe

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 08/92

Start of RCC: 08/92

End of RCC: 12/96

End of Project: 08/97

Specifications

Height: 37 metres

Length: 337 metres

Volume of RCC: 78 m3x103

Total volume: 100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3001000

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Ibicui-Mirim

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: 07/97

Start of RCC: 07/97

End of RCC: 07/98

End of Project: 11/98

Specifications

Height: 37 metres

Length: 675 metres

Volume of RCC: 69 m3x103

Total volume: 95 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
30Low-lime flyash (ASTM Class F)
  
Val da Serra completed
Val da Serra completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Itabapoana

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: 04/98

Start of RCC: 04/98

End of RCC: 09/99

End of Project: -/00

Specifications

Height: 37 metres

Length: 212 metres

Volume of RCC: 45 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
 Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
45
Pozzolan (kg/m3)Pozzolan Type
55Ground-granulated blast-furnace slag
  
Rosal completed
Rosal completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Das Antas

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 10/08

Specifications

Height: 37 metres

Length: 281 metres

Volume of RCC: 75 m3x103

Total volume: 212 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
1.30 
Spillway
SlopeType
1.30 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Quatorze (XIV) de Julho completed
Quatorze (XIV) de Julho completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Sehb el Merga

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: 06/07

Start of RCC: 06/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 37 metres

Length: 480 metres

Volume of RCC: 85 m3x103

Total volume: 95 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
25Natural pozzolan (ASTM Class N)
  
Sehb el Merga completed
Sehb el Merga completed

Full Dam Information

Details

Country: South Africa

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Braamhoekspruit

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 06/10

End of Project: 02/11

Specifications

Height: 37 metres

Length: 330 metres

Volume of RCC: 90 m3x103

Total volume: 98 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.67RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.67RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Braamhoek completed
Braamhoek completed

Full Dam Information

Details

Country: Gabon

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ogooué

Reservoir capacity: -

Construction Dates

Start of Project: 11/08

Start of RCC: 11/08

End of RCC: -/12

End of Project: 08/13

Specifications

Height: 37 metres

Length: 300 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
105
96
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
64 
Grand Poubara completed
Grand Poubara completed

Full Dam Information

Details

Country: Panama

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bonyic

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 08/14

End of Project: -/15

Specifications

Height: 37 metres

Length: 165 metres

Volume of RCC: -

Total volume: 88 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bonyic completed
Bonyic completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Zimari

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 37 metres

Length: 126 metres

Volume of RCC: -

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates