Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Hongpo [A-G] | China | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) | |
Helong | China | H R W | Hailanhe | 30 | 11/98 | 08/99 | 01/02 | 12/02 | 30 | 244 | 43 | 89 | V | (1) | 0.75 | (10) | ogee | (10)* | 300 | 2000 | 113 | 113 | (F) | |
Yangxishui Nº1 | China | H I | Yangxishui | 100 | 12/00 | 10/01 | 11/02 | 06/03 | 82 | 244 | 241 | 340 | V | (1) | V 0.75 | (1) (1)* | 0.70 | (12) | 300 | 300 | (F) | |||
Yumen | China | F H N | Luohe | 28 | - /05 | - /06 | - /07 | - /08 | 62 | 244 | 133 | 234 | ||||||||||||
Middle Yeywa | Myanmar | H | Myitnge | 453 | 17/00 | - /19 | - /23 | - /25 | 160 | 244 | 1700 |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.50 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
54 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
99 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 11/98
Start of RCC: 11/98
End of RCC: 01/02
End of Project: 12/02
Specifications
Height: 30 metres
Length: 244 metres
Volume of RCC: 43 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
ogee | RCC against precast concrete blocks [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2000 |
Cementitious material
Cement (kg/m3) |
---|
113 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
113 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Yangxishui
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 12/00
Start of RCC: 12/00
End of RCC: 11/02
End of Project: 06/03
Specifications
Height: 82 metres
Length: 244 metres
Volume of RCC: 241 m3x103
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Luohe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 62 metres
Length: 244 metres
Volume of RCC: 133 m3x103
Total volume: 234 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Myanmar
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Myitnge
Reservoir capacity: 453 m3x106
Construction Dates
Start of Project: 17/00
Start of RCC: 17/00
End of RCC: -/23
End of Project: -/25
Specifications
Height: 160 metres
Length: 244 metres
Volume of RCC: 1700 m3x103
Total volume: -
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates