SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Carroll E. Ecton - formerly WinchesterUSAWUpper Howard Creek206/8408/8411/8401/85233632427V(6)V
1.00
(5)
(17)
1.00(1)3003001040(-) -
Grindstone CanyonUSAWGrindstone209/8505/8607/8610/86424328896V(1)0.75(1)*0.75(1)300300760(-) -
Los MoralesSpainWMorales206/8602/8710/8712/87282002226V(1)
(3)
0.75(3)*0.75(1)300 -
400
300 -
400
80
74
140
128
(F)
Tirgu JiuRomaniaHJiu208/8606/8805/8912/9324611326 (12) (12)ogee(12)3009001250(-) -
MaroñoSpainWIzoria and Idas201/8911/8908/9011/915318280910.05(3)V
0.75
(3)*
(3)*
0.75(1)*30030080
65
160
170
(F)
Maojiang
[A]
ChinaH IXiang2- /92- /93- /94- /9545150 45          (F)
YoshidaJapanF WYoshida207/9107/9302/9503/9675218265304V(1)0.75(1)0.75(1)2507508436(F)
Rio do Peixe IIBrazilHDo Peixe202/9612/9612/97- /98323002034V(1)0.80(1)*0.80(1)*300300120
90
0
0
(-) -
Penn ForestUSAWWild Creek208/9609/9710/9812/9849610283283V(6)0.50(15)
(7)
conduit 3003005841(F)
Yangxishui Nº3ChinaHYangxishui211/9709/9806/9907/0046202100139V(1)V
0.75
(1)
(1)*
0.70(12)300300  (F)
Peñas BlancasCosta RicaHPeñas Blancas204/0007/0101/0207/0248211120170V(1)0.80(1)*0.80(12)3003009035(N)
Hunting RunUSAWHunting Run205/0002/0101/0208/0236720115128V(8) (17) (17)3003007437(F)
Maobaguan
[A]
ChinaHRenhe2- /00- /02- /03- /046612081106           
Huilong PSS - Lower damChinaH 206/01- /0206/04- /055417588105V(3')0.75(3')*0.75(12)300300  (F)
Big CherryUSAWSouth Fork, Powell River204/0409/0401/0507/05261131112      3003008282(F)
São BernardoBrazilH 2- /03- /04- /05- /0620120             
Duas SerrasBrazilFDuas Serras2- /05- /06- /07- /08191136       300300   
ChibkaMoroccoIChbika2- /04- /06- /08- /0924              
São PedroBrazilHJacu Braço Norte2- /06- /07- /09- /10301402235           
Mulungu do MorroBrazilI WTijuco2- /07- /08- /0903/101615613            
Ait Moulay AhmedMoroccoI WAin Leuh210/09- /1001/1110/11291361820V(5)0.75(1)*0.75(1)*3003007030(N)
Gov. Jayme Canet Junior (formerly Antiga Mauá)BrazilHTibagi2- /0901/1005/11- /1285745633753V(2)0.80(10)  30024006015(N)
AkçakocaTurkeyI WSarma201/1305/1510/16- /1766148851300.10(1)0.80(1)0.80(12)300    
Cudi-CircipTurkeyICircip2- /16- /17- /18- /193021348590.10(1)0.80(1)0.80(12)30012009852 
DereçatiTurkeyIBüyükdere2- /16- /18- /20- /2151174110            
ZimariTurkeyWZimari2- /18- /21- /23- /2437126 80           
Tekke KavakliTurkeyI WÇat2- /19- /22- /24- /2542325225            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Upper Howard Creek

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 06/84

Start of RCC: 06/84

End of RCC: 11/84

End of Project: 01/85

Specifications

Height: 23 metres

Length: 363 metres

Volume of RCC: 24 m3x103

Total volume: 27 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
VerticalTraditional concrete against precast concrete panels
1.00Unformed face of RCC
Spillway
SlopeType
1.00Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
104
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Carroll E. Ecton - formerly Winchester completed
Carroll E. Ecton - formerly Winchester completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Grindstone

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 09/85

Start of RCC: 09/85

End of RCC: 07/86

End of Project: 10/86

Specifications

Height: 42 metres

Length: 432 metres

Volume of RCC: 88 m3x103

Total volume: 96 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
76
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Grindstone Canyon completed
Grindstone Canyon completed

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Morales

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 06/86

Start of RCC: 06/86

End of RCC: 10/87

End of Project: 12/87

Specifications

Height: 28 metres

Length: 200 metres

Volume of RCC: 22 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
 RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
400400

Cementitious material

Cement (kg/m3)
80
74
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
128 
Los Morales completed
Los Morales completed

Full Dam Information

Details

Country: Romania

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jiu

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 08/86

Start of RCC: 08/86

End of RCC: 05/89

End of Project: 12/93

Specifications

Height: 24 metres

Length: 61 metres

Volume of RCC: 13 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Tirgu Jiu on Google Earth
Tirgu Jiu on Google Earth

Full Dam Information

Details

Country: Spain

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Izoria and Idas

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 01/89

Start of RCC: 01/89

End of RCC: 08/90

End of Project: 11/91

Specifications

Height: 53 metres

Length: 182 metres

Volume of RCC: 80 m3x103

Total volume: 91 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork
Downstream
SlopeType
VerticalRCC against formwork  [stepped face]
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
65
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
170 
Maroño completed
Maroño completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Xiang

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 45 metres

Length: 150 metres

Volume of RCC: -

Total volume: 45 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Yoshida

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 07/91

Start of RCC: 07/91

End of RCC: 02/95

End of Project: 03/96

Specifications

Height: 75 metres

Length: 218 metres

Volume of RCC: 265 m3x103

Total volume: 304 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Yoshida completed
Yoshida completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Do Peixe

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 02/96

Start of RCC: 02/96

End of RCC: 12/97

End of Project: -/98

Specifications

Height: 32 metres

Length: 300 metres

Volume of RCC: 20 m3x103

Total volume: 34 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
0 
Rio do Peixe II completed
Rio do Peixe II completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Wild Creek

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 08/96

Start of RCC: 08/96

End of RCC: 10/98

End of Project: 12/98

Specifications

Height: 49 metres

Length: 610 metres

Volume of RCC: 283 m3x103

Total volume: 283 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.50RCC supported by fill shoulders
 RCC against precast concrete panels
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
58
Pozzolan (kg/m3)Pozzolan Type
41Low-lime flyash (ASTM Class F)
  
Penn Forest completed
Penn Forest completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Yangxishui

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 11/97

Start of RCC: 11/97

End of RCC: 06/99

End of Project: 07/00

Specifications

Height: 46 metres

Length: 202 metres

Volume of RCC: 100 m3x103

Total volume: 139 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Costa Rica

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Peñas Blancas

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 04/00

Start of RCC: 04/00

End of RCC: 01/02

End of Project: 07/02

Specifications

Height: 48 metres

Length: 211 metres

Volume of RCC: 120 m3x103

Total volume: 170 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
35Natural pozzolan (ASTM Class N)
  
Peñas Blancas completed
Peñas Blancas completed

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Hunting Run

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 05/00

Start of RCC: 05/00

End of RCC: 01/02

End of Project: 08/02

Specifications

Height: 36 metres

Length: 720 metres

Volume of RCC: 115 m3x103

Total volume: 128 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with geomembrane
Downstream
SlopeType
 Unformed face of RCC
Spillway
SlopeType
 Unformed face of RCC

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
74
Pozzolan (kg/m3)Pozzolan Type
37Low-lime flyash (ASTM Class F)
  
Hunting Run completed
Hunting Run completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Renhe

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/03

End of Project: -/04

Specifications

Height: 66 metres

Length: 120 metres

Volume of RCC: 81 m3x103

Total volume: 106 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 06/04

End of Project: -/05

Specifications

Height: 54 metres

Length: 175 metres

Volume of RCC: 88 m3x103

Total volume: 105 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: South Fork, Powell River

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: 01/05

End of Project: 07/05

Specifications

Height: 26 metres

Length: 113 metres

Volume of RCC: 11 m3x103

Total volume: 12 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
82
Pozzolan (kg/m3)Pozzolan Type
82Low-lime flyash (ASTM Class F)
  
Big Cherry completed
Big Cherry completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/06

Specifications

Height: 20 metres

Length: 120 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Bernardo completed
São Bernardo completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Duas Serras

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 19 metres

Length: 113 metres

Volume of RCC: 6 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Duas Serras on Google Earth
Duas Serras on Google Earth

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Chbika

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/08

End of Project: -/09

Specifications

Height: 24 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Chibka on Google Earth
Chibka on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jacu Braço Norte

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 30 metres

Length: 140 metres

Volume of RCC: 22 m3x103

Total volume: 35 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Pedro completed
São Pedro completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Tijuco

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: 03/10

Specifications

Height: 16 metres

Length: 156 metres

Volume of RCC: 13 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mulungu do Morro completed
Mulungu do Morro completed

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Ain Leuh

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 10/09

Start of RCC: 10/09

End of RCC: 01/11

End of Project: 10/11

Specifications

Height: 29 metres

Length: 136 metres

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Ait Moulay Ahmed completed
Ait Moulay Ahmed completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tibagi

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: 05/11

End of Project: -/12

Specifications

Height: 85 metres

Length: 745 metres

Volume of RCC: 633 m3x103

Total volume: 753 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Gov. Jayme Canet Junior (formerly Antiga Mauá) completed
Gov. Jayme Canet Junior (formerly Antiga Mauá) completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Sarma

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 01/13

Start of RCC: 01/13

End of RCC: 10/16

End of Project: -/17

Specifications

Height: 66 metres

Length: 148 metres

Volume of RCC: 85 m3x103

Total volume: 130 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Akçakoca completed
Akçakoca completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Circip

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 30 metres

Length: 213 metres

Volume of RCC: 48 m3x103

Total volume: 59 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
98
Pozzolan (kg/m3)Pozzolan Type
52 
  
Cudi-Circip on Google Earth
Cudi-Circip on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Büyükdere

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/20

End of Project: -/21

Specifications

Height: 51 metres

Length: 174 metres

Volume of RCC: 110 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dereçati completed
Dereçati completed

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Zimari

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 37 metres

Length: 126 metres

Volume of RCC: -

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Çat

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/24

End of Project: -/25

Specifications

Height: 42 metres

Length: 325 metres

Volume of RCC: 225 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tekke Kavakli under construction
Tekke Kavakli under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates