Dam Search Results
- Dimensions
- Height: 119 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
La Breña II | Spain | I | Guadiato | 823 | 06/05 | 02/07 | 10/08 | 12/08 | 119 | 685 | 1441 | 1600 | 0.05 0.30 | (3') (3') | 0.75 | (3')* | 0.75 | (3')* | 300 | 300 | 69 | 115 & 46 | (F) | |
Yunkou [A] | China | H | Wuni | 35 | 06/07 | 04/08 | 06/09 | - /12 | 119 | 152 | 200 | 205 | ||||||||||||
Yunishigawa | Japan | F I W | Yunishi | 75 | 08/08 | 09/09 | 05/11 | 09/12 | 119 | 320 | 967 | 1053 | V 0.60 | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 1000 | 91 | 39 | (F) | |
Longkaikou | China | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | |||
Shannipo [A] | China | H | Beipan | 85 | - /09 | - /11 | - /13 | - /15 | 119 | 205 | 199 | 267 | curve | (3') | curve | (3) | ogee | (3) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Spain
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Guadiato
Reservoir capacity: 823 m3x106
Construction Dates
Start of Project: 06/05
Start of RCC: 06/05
End of RCC: 10/08
End of Project: 12/08
Specifications
Height: 119 metres
Length: 685 metres
Volume of RCC: 1441 m3x103
Total volume: 1600 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork (GEVR/GE-RCC) |
0.30 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
69 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
115 & | Low-lime flyash (ASTM Class F) |
46 |
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Wuni
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 06/09
End of Project: -/12
Specifications
Height: 119 metres
Length: 152 metres
Volume of RCC: 200 m3x103
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Yunishi
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: 05/11
End of Project: 09/12
Specifications
Height: 119 metres
Length: 320 metres
Volume of RCC: 967 m3x103
Total volume: 1053 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.60 |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
96 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
96 | Low-lime flyash (ASTM Class F) |
90 |
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/15
Specifications
Height: 119 metres
Length: 205 metres
Volume of RCC: 199 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates